Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/03/2024 | BULD - Electrical Clearance | Partial Pass | Partial pass for DGL clearance from MSA installation. Called clearance to TEP at 11. CLEAR DGL |
|
| 11/12/2024 | BULD - Electrical Clearance | Canceled | by Contractor | |
| 11/19/2024 | BULD - Electrical Clearance | Passed | Approved - DGC Clearance to TEP is required for the Solar meter |