Permit: TC-RES-0824-04693
Permit Details
Apply Date:
08/12/2024
Applicant:
Tina Wilson
Description:
IN GROUND POOL WITH EQUIPMENT
Permit Reviews
Permit Number - TC-RES-0824-04693
Permit Status: Inspections
Permit Description: IN GROUND POOL WITH EQUIPMENT
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
08/13/2024 | RESIDENTIAL POOL v.1 | 08/28/2024 | APPROVED |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-RES-0824-04693
Permit Description: IN GROUND POOL WITH EQUIPMENT
Total Completed Inspections - 5
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/25/2024 | Pool/Spa - Pre-Gunite | Passed | Rebar reinforcement is properly installed and supported off of ground, underground pipes are installed and connected to pool equipment, water line for auto-fill is installed with vacuum breaker, electrical conduit is installed for pool equipment and pool light, and bonding wire is ran completely around pool and connected to rebar and pool equipment. Okay to proceed with application of gunite for pool side and floor. | |
10/25/2024 | Pool/Spa - Plumbing | Passed | Underground plumbing is complete from pool pump equipment to drain and pool bottom cleaners. Auto-fill pipe is installed with vacuum breaker at main water supply line to house, and entire system is under water pressure test. | |
10/25/2024 | Pool/Spa - Bonding Grip | Passed | Bonding wire is properly connected to pool equipment and rebar reinforcement around pool. | |
10/25/2024 | Pool/Spa - Electric | Passed | pool equipment control panel and GFCI receptacle are installed, conduit is installed in trench to main electrical panel, and Bonding wire is properly connected to pool equipment and rebar reinforcement around pool. | |
10/25/2024 | RSEL - Electrical Progress | Passed | pool equipment control panel and GFCI receptacle are installed, conduit is installed in trench to main electrical panel, and Bonding wire is properly connected to pool equipment and rebar reinforcement around pool. |