Inspection Status: Passed
Inspection History: Pool/Spa - Pre-Gunite
| Date |
Description |
Inspector |
Results |
Comments |
| 10/25/2024 |
Pool/Spa - Pre-Gunite |
|
Passed |
Rebar reinforcement is properly installed and supported off of ground, underground pipes are installed and connected to pool equipment, water line for auto-fill is installed with vacuum breaker, electrical conduit is installed for pool equipment and pool light, and bonding wire is ran completely around pool and connected to rebar and pool equipment. Okay to proceed with application of gunite for pool side and floor. |