Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Apply Date:
08/06/2024
Applicant:
Gary Holland
Description:
Arizona Room Addition CE-VIO0724-02967

Permit Reviews

Permit Number - TC-RES-0824-04587
Permit Status: Complete
Permit Description: Arizona Room Addition CE-VIO0724-02967
Start Date Submittal Complete Date Status  
08/06/2024 RESIDENTIAL NEW DWELLING v.1 08/06/2024 REQUIRES RESUBMIT Review Details
03/19/2026 ADMINISTRATIVE v.1 03/19/2026 REQUIRES RESUBMIT Review Details
08/06/2024 RESIDENTIAL NEW DWELLING v.2 08/06/2024 REQUIRES RESUBMIT Review Details
04/01/2026 ADMINISTRATIVE v.2 N/A APPROVED Review Details
09/04/2025 RESIDENTIAL NEW DWELLING v.4 10/10/2025 REQUIRES RESUBMIT Review Details
03/02/2026 RESIDENTIAL NEW DWELLING v.5 03/18/2026 APPROVED Review Details
08/01/2025 RESIDENTIAL NEW DWELLING v.3 08/01/2025 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-RES-0824-04587
Permit Status: Complete
Permit Description: Arizona Room Addition CE-VIO0724-02967
Date Description Comments
03/18/2026 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-RES-0824-04587
Permite Description: Arizona Room Addition CE-VIO0724-02967
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
04/03/2026 COT - RSBU - Roof Nailing N/A Re-inspection required 4-3-26: the city is requiring that sections of siding be removed to access crawlspace to verify clearances and the removal of interior drywall so that we may verify proper installation electrical wiring, framing, plumbing & HVAC was done per approved plans. Please reschedule inspection at your convenience.

Completed Inspections

Permit Status: Complete
Permit Number: TC-RES-0824-04587
Permit Description: Arizona Room Addition CE-VIO0724-02967
Total Completed Inspections - 5
Date Description Inspector Results Comments
04/10/2026 COT - RSPL - Plumbing Final Passed 04/10/2026
Accessed crawlspaces to verify foundation and preservative-treated sill plates, framing and holdowns per plans. Received detailed photos of construction at rough-in to verify electrical, mechanical, and plumbing per plan.
04/10/2026 COT - RSME - Mechanical Final Passed 04/10/2026
Accessed crawlspaces to verify foundation and preservative-treated sill plates, framing and holdowns per plans. Received detailed photos of construction at rough-in to verify electrical, mechanical, and plumbing per plan.
04/10/2026 RSBU - Building Final Passed 04/10/2026
Accessed crawlspaces to verify foundation and preservative-treated sill plates, framing and holdowns per plans. Received detailed photos of construction at rough-in to verify electrical, mechanical, and plumbing per plan.
04/10/2026 COT - RSEL - Electrical Final Passed 04/10/2026
Accessed crawlspaces to verify foundation and preservative-treated sill plates, framing and holdowns per plans. Received detailed photos of construction at rough-in to verify electrical, mechanical, and plumbing per plan.
04/13/2026 COT - RSBU - Roof Nailing Passed 04/13/2026
This inspection passed 4/10/26: Accessed crawlspaces to verify foundation and preservative-treated sill plates, framing and holdowns per plans. Received detailed photos of construction at rough-in to verify electrical, mechanical, and plumbing per plan.