Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Roof NailingĀ
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/03/2026 | COT - RSBU - Roof NailingĀ | Re-inspection required | 4-3-26: the city is requiring that sections of siding be removed to access crawlspace to verify clearances and the removal of interior drywall so that we may verify proper installation electrical wiring, framing, plumbing & HVAC was done per approved plans. Please reschedule inspection at your convenience. | |
| 04/13/2026 | COT - RSBU - Roof NailingĀ | Passed | 04/13/2026 This inspection passed 4/10/26: Accessed crawlspaces to verify foundation and preservative-treated sill plates, framing and holdowns per plans. Received detailed photos of construction at rough-in to verify electrical, mechanical, and plumbing per plan. |