Permit: TC-RES-0824-04576
Permit Details
Status:
Inspections
Type:
Residential Building - One or Two Family
Address:
1722 S COLUMBUS BL
Address NEW:
1722 S COLUMBUS BL
Apply Date:
08/06/2024
Applicant:
Paul Dominguez
Description:
SFR Expansion and Remodel
Permit Reviews
Permit Number - TC-RES-0824-04576
Permit Status: Inspections
Permit Description: SFR Expansion and Remodel
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/06/2024 | RESIDENTIAL NEW DWELLING v.1 | 09/11/2024 | REQUIRES RESUBMIT |
| 11/20/2024 | RESTAMP - RESIDENTIAL v.1 | 11/20/2024 | APPROVED |
| 10/09/2024 | RESIDENTIAL NEW DWELLING v.2 | 11/20/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-RES-0824-04576
Permit Status: Inspections
Permit Description: SFR Expansion and Remodel
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 08/14/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-RES-0824-04576
Permite Description: SFR Expansion and Remodel
Total Outstanding Inspections - 6
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/13/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Re-inspection required | 3-13-25, wrap DWV underneath bath tub and fill in with concrete, add fire foam to marked locations at top plates, insulate or block any pex within 12" of can lights |
| 06/18/2025 | COT - RSEL - Electrical Final | N/A | Re-inspection required | Weep screed needs to be 2" above all paved areas and 4" above earth. Provide traffic rated caps for sewer. Add cover plates to receptacles, lighting, and gutter box. Add receptacle at kitchen counter @ 4' to the right of sink and at peninsula. Install hammer arrestor at hot line for dishwasher. Install all plumbing fixtures throughout. Water closets need to be in place and caulked. Panel needs to be labeled. Add non-metallic plumbing to panel schedule. Install anti siphons at hose bibs. Insulte exterior water lines and provide UV protection. Install correct size of fuse for AH. Wall with low voltage lines needs to be installed and finished. Provide ladder for attic access. 6/10/2025 6/18/25 see previous notes, also attic needs 24 inches unobscured crawlspace for service and service receptacle and lighting moved and installed |
| 06/18/2025 | RSBU - Building Final | N/A | Re-inspection required | Weep screed needs to be 2" above all paved areas and 4" above earth. Provide traffic rated caps for sewer. Add cover plates to receptacles, lighting, and gutter box. Add receptacle at kitchen counter @ 4' to the right of sink and at peninsula. Install hammer arrestor at hot line for dishwasher. Install all plumbing fixtures throughout. Water closets need to be in place and caulked. Panel needs to be labeled. Add non-metallic plumbing to panel schedule. Install anti siphons at hose bibs. Insulte exterior water lines and provide UV protection. Install correct size of fuse for AH. Wall with low voltage lines needs to be installed and finished. Provide ladder for attic access. 6/10/2025 6/18/25 see previous notes, also attic needs 24 inches unobscured crawlspace for service and service receptacle and lighting moved and installed |
| 06/18/2025 | COT - RSEL - Outdoor Lighting | N/A | Re-inspection required | Weep screed needs to be 2" above all paved areas and 4" above earth. Provide traffic rated caps for sewer. Add cover plates to receptacles, lighting, and gutter box. Add receptacle at kitchen counter @ 4' to the right of sink and at peninsula. Install hammer arrestor at hot line for dishwasher. Install all plumbing fixtures throughout. Water closets need to be in place and caulked. Panel needs to be labeled. Add non-metallic plumbing to panel schedule. Install anti siphons at hose bibs. Insulte exterior water lines and provide UV protection. Install correct size of fuse for AH. Wall with low voltage lines needs to be installed and finished. Provide ladder for attic access. 6/10/2025 6/18/25 see previous notes, also attic needs 24 inches unobscured crawlspace for service and service receptacle and lighting moved and installed |
| 06/18/2025 | COT - RSME - Mechanical Final | N/A | Re-inspection required | Weep screed needs to be 2" above all paved areas and 4" above earth. Provide traffic rated caps for sewer. Add cover plates to receptacles, lighting, and gutter box. Add receptacle at kitchen counter @ 4' to the right of sink and at peninsula. Install hammer arrestor at hot line for dishwasher. Install all plumbing fixtures throughout. Water closets need to be in place and caulked. Panel needs to be labeled. Add non-metallic plumbing to panel schedule. Install anti siphons at hose bibs. Insulte exterior water lines and provide UV protection. Install correct size of fuse for AH. Wall with low voltage lines needs to be installed and finished. Provide ladder for attic access. 6/10/2025 6/18/25 see previous notes, also attic needs 24 inches unobscured crawlspace for service and service receptacle and lighting moved and installed |
| 06/18/2025 | COT - RSPL - Plumbing Final | N/A | Re-inspection required | Weep screed needs to be 2" above all paved areas and 4" above earth. Provide traffic rated caps for sewer. Add cover plates to receptacles, lighting, and gutter box. Add receptacle at kitchen counter @ 4' to the right of sink and at peninsula. Install hammer arrestor at hot line for dishwasher. Install all plumbing fixtures throughout. Water closets need to be in place and caulked. Panel needs to be labeled. Add non-metallic plumbing to panel schedule. Install anti siphons at hose bibs. Insulte exterior water lines and provide UV protection. Install correct size of fuse for AH. Wall with low voltage lines needs to be installed and finished. Provide ladder for attic access. 6/10/2025 6/18/25 see previous notes, also attic needs 24 inches unobscured crawlspace for service and service receptacle and lighting moved and installed |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-RES-0824-04576
Permit Description: SFR Expansion and Remodel
Total Completed Inspections - 8
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/04/2024 | COT - RSPL - Rough Soil | Passed | Underground plumbing approved. Asked to send in an as built drawings due to plumbing running straight to tie in and not around the home. Okay to backfill. Shading required. 12/4/2024 | |
| 12/09/2024 | COT - RSBU - Preslab | Passed | ||
| 02/03/2025 | COT - RSBU - Roof Nailing | Passed | 2/3/25 pass | |
| 02/11/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 02/13/2025 | COT - RSPL - Gas Pressure Test | Passed | ||
| 03/19/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Ok to insulate and Sheetrock throughout. | |
| 06/10/2025 | COT - BULD - SWG Clearance | Passed | Clearance for Southwest Gas. 6/10/2025 | |
| 06/18/2025 | COT - RSEL - Grounding/Bonding | Passed | Passed 6/18/25 |