Permit: TC-RES-0824-04526
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
5302 E 4TH ST
Address NEW:
5302 E 4TH ST
Apply Date:
08/02/2024
Applicant:
Eugene Tsirklin
Description:
Freestanding Detached Deck
Permit Reviews
Permit Number - TC-RES-0824-04526
Permit Status: Complete
Permit Description: Freestanding Detached Deck
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/16/2025 | RESIDENTIAL NEW DWELLING REVISION v.1 | 05/19/2025 | APPROVED |
| 09/12/2024 | RESIDENTIAL NEW DWELLING v.2 | 10/09/2024 | APPROVED |
| 10/06/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/06/2025 | REQUIRES RESUBMIT |
| 12/16/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 12/19/2025 | REQUIRES RESUBMIT |
| 08/05/2024 | RESIDENTIAL NEW DWELLING v.1 | 09/06/2024 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-RES-0824-04526
Permit Status: Complete
Permit Description: Freestanding Detached Deck
| Date | Description | Comments |
|---|---|---|
| 10/09/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 09/17/2024 | SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-RES-0824-04526
Permite Description: Freestanding Detached Deck
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/28/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Not Ready | 1-Work is incomplete. 2-Completed steel work has multiple variances and/or deletions from approved plans; obtain approved revision, or reconstruct per approved plans. Note: Builder wants to pour over column attachments to footings; proceed at own risk. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0824-04526
Permit Description: Freestanding Detached Deck
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/07/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 3/7/25 passed ok to pour | |
| 04/24/2025 | COT - RSBU - Roof Nailing | Passed | ||
| 06/24/2025 | COT - RSEL - Electrical Final | Passed | ||
| 01/12/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 01/16/2026 | RSBU - Building Final | Passed |