Permit: TC-RES-0823-07434
Permit Details
Status:
Inspections Complete
Type:
Residential Building - One or Two Family
Address:
8536 E DESERT STEPPES DR UNIT 2
Address NEW:
8536 E DESERT STEPPES DR UNIT 2
Apply Date:
08/17/2023
Applicant:
Dirk Stilwell
Description:
Casita/ADU
Permit Reviews
Permit Number - TC-RES-0823-07434
Permit Status: Inspections complete
Permit Description: Casita/ADU
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/14/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 02/18/2025 | REQUIRES RESUBMIT |
| 08/25/2023 | RESIDENTIAL NEW DWELLING v.1 | 09/05/2023 | REQUIRES RESUBMIT |
| 04/22/2025 | RESIDENTIAL ADU REVISION v.1 | 05/15/2025 | APPROVED |
| 10/11/2023 | RESTAMP - RESIDENTIAL v.1 | 10/11/2023 | APPROVED |
| 02/27/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 02/27/2025 | APPROVED |
| 09/13/2023 | RESIDENTIAL NEW DWELLING v.2 | 10/02/2023 | APPROVED |
Conditions
Permit Number - TC-RES-0823-07434
Permit Status: Inspections complete
Permit Description: Casita/ADU
| Date | Description | Comments |
|---|---|---|
| 09/05/2023 | Please contact Pima County Addressing to resolve issue. Addressing@pima.gov or 520-724-9512 | |
| 10/02/2023 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as a contact. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 02/18/2025 | Submit manual J, D, S, and extended rating table information prior to intermediate inspections | |
| 09/05/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-RES-0823-07434
Permite Description: Casita/ADU
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/29/2024 | COT - RSBU - Masonry Pregrout | N/A | Canceled | |
| 09/16/2024 | BULD - Electrical Clearance | N/A | Not Ready | Not ready for electrical clearance, needed optional rebar inspection. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-RES-0823-07434
Permit Description: Casita/ADU
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/30/2024 | COT - RSPL - Rough Soil | Passed | ||
| 12/14/2023 | COT - RSPL - Yard Water Line | Passed | ||
| 01/16/2024 | COT - RSBU - Preslab | Passed | ||
| 05/03/2024 | COT - RSBU - Masonry Pregrout | Passed | 5/3/24: Okay to pour top bond beam and set anchor bolts for top plate. | |
| 06/21/2024 | COT - RSBU - Roof Nailing | Passed | ||
| 09/17/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Rebar inspection for porch passed per prints | |
| 03/03/2025 | RSEL - Electrical Progress | Passed | Grounding inspected and ok to bury. Power kill required for electrical clearance, needs temp breaker and receptacle as well as address labels on new main panel. Riser has proper bracing. | |
| 03/03/2025 | COT - RSEL - Electrical Underground | Passed | Underground per code, ok to backfill 3/3/25 | |
| 03/17/2025 | BULD - Electrical Clearance | Passed | ECO | |
| 05/21/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Passed 5/21/25 | |
| 05/21/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | Passed 5/21/25 | |
| 05/21/2025 | COT - RSPL - Gas Pressure Test | Passed | Passed 5/21/25 | |
| 09/24/2025 | COT - RSPL - Sewer | Passed | Approved for backfill | |
| 11/13/2025 | COT - BULD - SWG Clearance | Passed | 11.13.2025 Clearance for SW Gas, Unit 2 (ADU). Approved per plan, okay to backfill with shading materials. |
|
| 03/31/2026 | COT - RSEL - Electrical Final | Passed | Passed 3/31/26 | |
| 03/31/2026 | RSBU - Building Final | Passed | Passed 3/31/26 | |
| 03/31/2026 | COT - RSME - Mechanical Final | Passed | Passed 3/31/26 | |
| 03/31/2026 | COT - RSPL - Plumbing Final | Passed | Passed 3/31/26 | |
| 09/23/2026 | RSPL - Plumbing Progress | Passed | 09/23/2026 This inspection passed on 3/31/26. |
|
| 09/23/2026 | COT - RSEL - Grounding/Bonding | Passed | 09/23/2026 This inspection passed on 3/31/26. |
|
| 09/23/2026 | COT - RSEL - Outdoor Lighting | Passed | 09/23/2026 This inspection passed on 3/31/26. |