Permit: TC-RES-0823-07196
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
4626 E 7TH ST
Address NEW:
4626 E 7TH ST
Apply Date:
08/09/2023
Applicant:
Bailey Randall
Description:
Roof mounted PV system REV 2: Upgrading the main service Panel Square D Model # SC1642M100S. 6kwdc//4.35kwac 200A MPU 15 modules
Permit Reviews
Permit Number - TC-RES-0823-07196
Permit Status: Complete
Permit Description: Roof mounted PV system REV 2: Upgrading the main service Panel Square D Model # SC1642M100S.
6kwdc//4.35kwac
200A MPU
15 modules
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 12/07/2023 | RESIDENTIAL SOLAR v.2 | 12/13/2023 | APPROVED |
| 03/18/2024 | RESIDENTIAL SOLAR v.1 | 03/25/2024 | APPROVED |
| 11/28/2023 | RESIDENTIAL SOLAR v.1 | 12/06/2023 | REQUIRES RESUBMIT |
| 08/10/2023 | RESIDENTIAL SOLAR v.1 | 08/14/2023 | APPROVED |
Conditions
Permit Number - TC-RES-0823-07196
Permit Status: Complete
Permit Description: Roof mounted PV system REV 2: Upgrading the main service Panel Square D Model # SC1642M100S.
6kwdc//4.35kwac
200A MPU
15 modules
| Date | Description | Comments |
|---|---|---|
| 12/13/2023 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as a contact. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0823-07196
Permit Description: Roof mounted PV system REV 2: Upgrading the main service Panel Square D Model # SC1642M100S.
6kwdc//4.35kwac
200A MPU
15 modules
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/13/2024 | COT - RSOL - Grounding/Bonding Solar Project | Passed | ||
| 06/18/2024 | BULD - Electrical Clearance | Passed | Approved - DGC Clearance to TEP is required for the solar meter | |
| 06/18/2024 | COT - RSOL - Electrical Final Solar Project | Passed | ||
| 06/18/2024 | RSBU - Building Final | Passed |