Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/13/2024 | BULD - Electrical Clearance | Partial Pass | Partial for the 125A service panel upgrade, INCR Clearance was called into TEP at 11:10am Pending solar installation |
|
| 06/18/2024 | BULD - Electrical Clearance | Passed | Approved - DGC Clearance to TEP is required for the solar meter |