Permit: TC-RES-0726-03811
Permit Details
Status:
Inspections
Type:
Residential Building - One or Two Family
Address:
3836 S CAMINO ENSENADA DEL PANTANO
Address NEW:
3836 S CAMINO ENSENADA DEL PANTANO
Apply Date:
07/13/2026
Applicant:
Tim Willsey
Description:
13.5 kWh energy storage system.
Permit Reviews
Permit Number - TC-RES-0726-03811
Permit Status: Inspections
Permit Description: 13.5 kWh energy storage system.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/13/2026 | RESIDENTIAL SOLAR v.1 | 07/16/2026 | REQUIRES RESUBMIT |
| 07/17/2026 | RESIDENTIAL SOLAR v.2 | 07/23/2026 | APPROVED |
Conditions
Permit Number - TC-RES-0726-03811
Permit Status: Inspections
Permit Description: 13.5 kWh energy storage system.
| Date | Description | Comments |
|---|---|---|
| 07/23/2026 | Pre-Issuance - Required Documents - Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-RES-0726-03811
Permite Description: 13.5 kWh energy storage system.
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| BULD - Electrical Clearance | N/A | Scheduled | ||
| COT - RSEL - Grounding/Bonding | N/A | Scheduled | ||
| COT - RSOL - Electrical Final Solar Project | N/A | Scheduled |
Scheduled Inspections
Scheduled Inspections - TC-RES-0726-03811
Status: Inspections
Description: 13.5 kWh energy storage system.
| Scheduled Date | Description | Entered By | Entered Date |
|---|---|---|---|
| 09/21/2026 | BULD - Electrical Clearance | Scheduled | |
| 09/21/2026 | COT - RSEL - Grounding/Bonding | Scheduled | |
| 09/21/2026 | COT - RSOL - Electrical Final Solar Project | Scheduled |
For information about today’s scheduled inspections please refer to the
PDSD Daily Inspections Dashboards (Desktop)
PDSD Daily Inspections Dashboards (Mobile)
.