Permit: TC-RES-0726-03783
Permit Details
Status:
Issued
Type:
Residential Building - One or Two Family
Address:
2615 S MISSION RD UNIT 1
Address NEW:
2615 S MISSION RD UNIT 1
Apply Date:
07/10/2026
Applicant:
Inty Ops
Description:
INSTALLATION OF A TESLA POWERWALL 3 BATTERY STORAGE
Permit Reviews
Permit Number - TC-RES-0726-03783
Permit Status: Issued
Permit Description: INSTALLATION OF A TESLA POWERWALL 3 BATTERY STORAGE
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/16/2026 | ADMINISTRATIVE v.1 | N/A | REQUIRES RESUBMIT |
| 08/12/2026 | ADMINISTRATIVE v.2 | N/A | APPROVED |
| 07/10/2026 | RESIDENTIAL SIMPLE REVIEW v.1 | 07/13/2026 | REQUIRES RESUBMIT |
| 07/14/2026 | RESIDENTIAL SIMPLE REVIEW v.2 | N/A | REQUIRES RESUBMIT |
| 07/17/2026 | RESIDENTIAL SIMPLE REVIEW v.1 | 07/17/2026 | APPROVED |
| 07/16/2026 | RESIDENTIAL SIMPLE REVIEW v.3 | 07/16/2026 | APPROVED |
Conditions
Permit Number - TC-RES-0726-03783
Permit Status: Issued
Permit Description: INSTALLATION OF A TESLA POWERWALL 3 BATTERY STORAGE
| Date | Description | Comments |
|---|---|---|
| 07/10/2026 | Unit numbers must be included on the permit address, please submit a Change of Address request under sub records to add the additional unit. Step-by-step instructions on submitting a sub records request: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/tdc-faq/new-pdfs/sub-records_071425.pdf Step-by-Step instructions on how to resubmit: https://www.tucsonaz.gov/files/sharedassets/public/pdsd/documents/tdc-faq/new-pdfs/revisions-and-resubmittals.pdf | |
| 07/16/2026 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |