Permit: TC-RES-0725-03731
Permit Details
Status:
Inspections
Type:
Residential Building - One or Two Family
Address:
4582 S WHITE PINE DR
Address NEW:
4582 S WHITE PINE DR
Apply Date:
07/29/2025
Applicant:
Liam Atchley
Description:
Installing a new 18kw back up generator. There will be a new sub panel for the backed up loads, ATS, and a new dedicated gas line.
Permit Reviews
Permit Number - TC-RES-0725-03731
Permit Status: Inspections
Permit Description: Installing a new 18kw back up generator. There will be a new sub panel for the backed up loads, ATS, and a new dedicated gas line.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/29/2025 | RESIDENTIAL SIMPLE REVIEW v.1 | 07/30/2025 | REQUIRES RESUBMIT |
| 07/30/2025 | RESIDENTIAL SIMPLE REVIEW v.2 | 07/30/2025 | APPROVED |
Conditions
Permit Number - TC-RES-0725-03731
Permit Status: Inspections
Permit Description: Installing a new 18kw back up generator. There will be a new sub panel for the backed up loads, ATS, and a new dedicated gas line.
| Date | Description | Comments |
|---|---|---|
| 07/29/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-RES-0725-03731
Permit Description: Installing a new 18kw back up generator. There will be a new sub panel for the backed up loads, ATS, and a new dedicated gas line.
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/14/2025 | RSBU - Building Final | Passed | 8.14.25 Breaker is properly installed and labeled Natural gas generator is installed per plans Shut offs verified Lines properly supported line pressure verified APPROVED |
|
| 08/14/2025 | COT - RSEL - Electrical Final | Passed | 8.14.25 Breaker is properly installed and labeled Natural gas generator is installed per plans Shut offs verified Lines properly supported line pressure verified APPROVED |
|
| 08/14/2025 | COT - RSPL - Plumbing Final | Passed | 8.14.25 Breaker is properly installed and labeled Natural gas generator is installed per plans Shut offs verified Lines properly supported line pressure verified APPROVED |
|
| 08/14/2025 | COT - BULD - SWG Clearance | Passed | 8.14.25 Breaker is properly installed and labeled Natural gas generator is installed per plans Shut offs verified Lines properly supported line pressure verified APPROVED |