Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Residential Building - One or Two Family
Address NEW:
4582 S WHITE PINE DR
Apply Date:
07/29/2025
Applicant:
Liam Atchley
Description:
Installing a new 18kw back up generator. There will be a new sub panel for the backed up loads, ATS, and a new dedicated gas line.

Permit Reviews

Permit Number - TC-RES-0725-03731
Permit Status: Inspections
Permit Description: Installing a new 18kw back up generator. There will be a new sub panel for the backed up loads, ATS, and a new dedicated gas line.
Start Date Submittal Complete Date Status  
07/29/2025 RESIDENTIAL SIMPLE REVIEW v.1 07/30/2025 REQUIRES RESUBMIT Review Details
07/30/2025 RESIDENTIAL SIMPLE REVIEW v.2 07/30/2025 APPROVED Review Details

Conditions

Permit Number - TC-RES-0725-03731
Permit Status: Inspections
Permit Description: Installing a new 18kw back up generator. There will be a new sub panel for the backed up loads, ATS, and a new dedicated gas line.
Date Description Comments
07/29/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.

Completed Inspections

Permit Status: Inspections
Permit Number: TC-RES-0725-03731
Permit Description: Installing a new 18kw back up generator. There will be a new sub panel for the backed up loads, ATS, and a new dedicated gas line.
Total Completed Inspections - 4
Date Description Inspector Results Comments
08/14/2025 RSBU - Building Final Passed 8.14.25
Breaker is properly installed and labeled
Natural gas generator is installed per plans
Shut offs verified
Lines properly supported
line pressure verified
APPROVED
08/14/2025 COT - RSEL - Electrical Final Passed 8.14.25
Breaker is properly installed and labeled
Natural gas generator is installed per plans
Shut offs verified
Lines properly supported
line pressure verified
APPROVED
08/14/2025 COT - RSPL - Plumbing Final Passed 8.14.25
Breaker is properly installed and labeled
Natural gas generator is installed per plans
Shut offs verified
Lines properly supported
line pressure verified
APPROVED
08/14/2025 COT - BULD - SWG Clearance Passed 8.14.25
Breaker is properly installed and labeled
Natural gas generator is installed per plans
Shut offs verified
Lines properly supported
line pressure verified
APPROVED

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
PLANSET V1_V1.PDF DOCUMENTS VIEW