Inspection History Details
Inspection Status: Passed
Inspection History: RSBU - Building FinalĀ
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/14/2025 | RSBU - Building FinalĀ | Passed | 8.14.25 Breaker is properly installed and labeled Natural gas generator is installed per plans Shut offs verified Lines properly supported line pressure verified APPROVED |