Permit: TC-RES-0723-06838
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
3373 N FORGEUS AV
Address NEW:
3373 N FORGEUS AV
Apply Date:
07/26/2023
Applicant:
Elizabeth Eadie
Description:
SFR Renovation and Bedroom with Bathroom Addition
Permit Reviews
Permit Number - TC-RES-0723-06838
Permit Status: Complete
Permit Description: SFR Renovation and Bedroom with Bathroom Addition
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/19/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 07/19/2024 | APPROVED |
| 07/18/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/19/2024 | REQUIRES RESUBMIT |
| 09/06/2023 | RESIDENTIAL NEW DWELLING v.2 | 09/26/2023 | APPROVED |
| 08/02/2023 | RESIDENTIAL NEW DWELLING v.1 | 08/10/2023 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-RES-0723-06838
Permit Status: Complete
Permit Description: SFR Renovation and Bedroom with Bathroom Addition
| Date | Description | Comments |
|---|---|---|
| 09/26/2023 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as a contact. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 09/19/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-RES-0723-06838
Permite Description: SFR Renovation and Bedroom with Bathroom Addition
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/24/2024 | RSBU - Building Final | N/A | Not Ready | Smoke detectors, not functional |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0723-06838
Permit Description: SFR Renovation and Bedroom with Bathroom Addition
Total Completed Inspections - 17
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/25/2024 | COT - BULD - SWG Clearance | Passed | Clearance for Southwest Gas. 1/25/24 | |
| 01/25/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
| 02/23/2024 | COT - RSPL - Rough Soil | Passed | Underground plumbing is complete and under water test with no leaks. Okay to shade and backfill trench and prepare for compaction of subsoil. | |
| 02/23/2024 | COT - RSPL - Sewer | Passed | Underground plumbing is complete and under water test with no leaks. Okay to shade and backfill trench and prepare for compaction of subsoil. | |
| 02/27/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Rebar per plan okay for concrete placement in footing and slab. 2/27/2024 | |
| 02/27/2024 | COT - RSBU - Preslab | Passed | Rebar per plan okay for concrete placement in footing and slab. 2/27/2024 | |
| 04/01/2024 | BULD - Electrical Clearance | Passed | Clearance for TEP INCR. 4/1/2024 | |
| 04/01/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
| 06/24/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 06/24/2024 | COT - RSBU - Roof Nailing | Passed | ||
| 07/26/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 10/24/2024 | RSBU - Building Progress | Passed | ||
| 10/24/2024 | COT - RSEL - Electrical Final | Passed | ||
| 10/24/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
| 10/24/2024 | COT - RSME - Mechanical Final | Passed | ||
| 10/24/2024 | COT - RSPL - Plumbing Final | Passed | ||
| 01/28/2025 | RSBU - Building Final | Passed |