Permit: TC-RES-0723-06697
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
3625 E SENECA ST
Address NEW:
3625 E SENECA ST
Apply Date:
07/20/2023
Applicant:
Perla Vargas
Description:
Installation roof mounted pv system + Tesla inverters included. 5.28KW DC/ 7.6KW AC 12 modules
Permit Reviews
Permit Number - TC-RES-0723-06697
Permit Status: Complete
Permit Description: Installation roof mounted pv system + Tesla inverters included.
5.28KW DC/ 7.6KW AC
12 modules
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/24/2023 | RESIDENTIAL SOLAR v.1 | 08/17/2023 | REQUIRES RESUBMIT |
| 02/07/2024 | RESIDENTIAL SOLAR v.2 | 02/13/2024 | APPROVED |
Conditions
Permit Number - TC-RES-0723-06697
Permit Status: Complete
Permit Description: Installation roof mounted pv system + Tesla inverters included.
5.28KW DC/ 7.6KW AC
12 modules
| Date | Description | Comments |
|---|---|---|
| 02/13/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0723-06697
Permit Description: Installation roof mounted pv system + Tesla inverters included.
5.28KW DC/ 7.6KW AC
12 modules
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/19/2024 | BULD - Electrical Clearance | Passed | DGL/DGC CLEARANCE called into TEP at 11:45 for LST PK. CLEAR DGL |
|
| 03/19/2024 | COT - RSOL - Electrical Final Solar Project | Passed | ||
| 03/19/2024 | RSBU - Building Final | Passed | RECN CLEARANCE called into TEP at 11:45 for LST PK. CLEAR DGL CLOSE PERMIT |