Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-RES-0723-06687
Permit Details
Apply Date:
07/20/2023
Applicant:
leanne campos
Description:
New Residential swimming pool and spa
Permit Reviews
Permit Number - TC-RES-0723-06687
Permit Status: Issued
Permit Description: New Residential swimming pool and spa
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
07/27/2023 | RESIDENTIAL NEW DWELLING v.1 | 08/02/2023 | APPROVED |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-RES-0723-06687
Permite Description: New Residential swimming pool and spa
Total Outstanding Inspections - 3
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/27/2023 | Pool/Spa - Bonding Grip | N/A | Partial Pass | 9/27/23 plumbing holding, gas psi holding 15 psi grounding and bonding just needs bond at gas line by pool equipment. electric conduit in place and ready for wires |
09/27/2023 | Pool/Spa - Electric | N/A | Partial Pass | 9/27/23 plumbing holding, gas psi holding 15 psi grounding and bonding just needs bond at gas line by pool equipment. electric conduit in place and ready for wires |
09/27/2023 | RSEL - Electrical Progress | N/A | Partial Pass | 9/27/23 plumbing holding, gas psi holding 15 psi grounding and bonding just needs bond at gas line by pool equipment. electric conduit in place and ready for wires |
Completed Inspections
Permit Status: Issued
Permit Number: TC-RES-0723-06687
Permit Description: New Residential swimming pool and spa
Total Completed Inspections - 9
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/27/2023 | Pool/Spa - Plumbing | Passed | 9/27/23 plumbing holding, gas psi holding 15 psi grounding and bonding just needs bond at gas line by pool equipment. electric conduit in place and ready for wires | |
09/27/2023 | Pool/Spa - Pre-Gunite | Passed | 9/27/23 plumbing holding, gas psi holding 15 psi grounding and bonding just needs bond at gas line by pool equipment. electric conduit in place and ready for wires | |
09/27/2023 | COT - BULD - SWG Clearance | Passed | 9/27/23 plumbing holding, gas psi holding 15 psi grounding and bonding just needs bond at gas line by pool equipment. electric conduit in place and ready for wires | |
01/08/2024 | COT - RSEL - Electrical Final | Passed | ||
01/08/2024 | Pool/Spa - Bonding Grip | Passed | ||
01/08/2024 | Pool/Spa - Electric | Passed | ||
01/08/2024 | Pool/Spa - Final/Barrier | Passed | ||
01/08/2024 | RSBU - Building Final | Passed | ||
01/08/2024 | RSEL - Electrical Progress | Passed |