Inspection History Details
Inspection Status: Passed
Inspection History: Pool/Spa - Pre-Gunite
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/27/2023 | Pool/Spa - Pre-Gunite | Passed | 9/27/23 plumbing holding, gas psi holding 15 psi grounding and bonding just needs bond at gas line by pool equipment. electric conduit in place and ready for wires |