Permit: TC-RES-0723-06650
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
513 S CATALINA AV
Address NEW:
513 S CATALINA AV
Apply Date:
07/19/2023
Applicant:
Russell Noon
Description:
Garage
Permit Reviews
Permit Number - TC-RES-0723-06650
Permit Status: Complete
Permit Description: Garage
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/24/2023 | RESIDENTIAL NEW DWELLING v.1 | 08/09/2023 | REQUIRES RESUBMIT |
| 12/15/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 12/23/2024 | APPROVED |
| 09/01/2023 | RESIDENTIAL NEW DWELLING v.2 | 09/26/2023 | REQUIRES RESUBMIT |
| 10/31/2023 | RESIDENTIAL NEW DWELLING v.3 | 11/15/2023 | APPROVED |
Conditions
Permit Number - TC-RES-0723-06650
Permit Status: Complete
Permit Description: Garage
| Date | Description | Comments |
|---|---|---|
| 11/15/2023 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as a contact. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 08/09/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0723-06650
Permit Description: Garage
Total Completed Inspections - 8
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/11/2023 | COT - RSEL - Grounding/Bonding | Passed | Ufer ground is properly connected to a 20' piece of rebar reinforcement in the bottom of footer. | |
| 12/11/2023 | COT - RSBU - Preslab | Passed | Subsoil is properly compacted, forms are in place, rebar is properly supported, and Ufer ground is installed. Okay to pour concrete. | |
| 12/11/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Rebar reinforcement is properly installed. | |
| 01/26/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Exterior walls are framed out, roof trusses are installed and properly clipped with Simpson clips. Okay to proceed with shear panels and roof sheathing. | |
| 02/23/2024 | COT - RSBU - Roof Nailing | Passed | ||
| 02/23/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 05/23/2024 | COT - RSBU - Firewall/Fire Barrier/Firestop | Passed | ||
| 11/15/2024 | RSBU - Building Final | Passed |