Permit Details

Status:
Stop Work Order
Type:
Residential Building - One or Two Family
Address NEW:
6271 E 25TH ST UNIT 2
Apply Date:
06/18/2026
Applicant:
Greg Geile
Description:
ADU

Permit Reviews

Permit Number - TC-RES-0626-03300
Permit Status: Stop work order
Permit Description: ADU
Start Date Submittal Complete Date Status  
07/15/2026 RESIDENTIAL ADU v.2 07/24/2026 REQUIRES RESUBMIT Review Details
06/24/2026 RESIDENTIAL ADU v.1 06/29/2026 REQUIRES RESUBMIT Review Details
08/04/2026 RESIDENTIAL ADU v.3 08/10/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-RES-0626-03300
Permit Status: Stop work order
Permit Description: ADU
Total Outstanding Activity Conditions - 1
Date Name
06/29/2026 Submit the Air Leakage & Duct Tightness Test Report completed by an Approved Special Inspector prior to Final Inspections.

Conditions

Permit Number - TC-RES-0626-03300
Permit Status: Stop work order
Permit Description: ADU
Date Description Comments
06/24/2026 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
06/24/2026 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Outstanding Inspections

Permit Status: Stop Work Order
Permit Number: TC-RES-0626-03300
Permite Description: ADU
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
09/24/2026 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Re-inspection required 09/24/2026
Brace air registers throughout, add Boca nail plates to sill plates on DWV pipes within 1.25", DWV not fully under test, add blocking for future grab bars at toilet and showers 33"-36".
09/25/2026 COT - RSEL - Electrical Underground N/A Not Applicable
11/02/2026 RSBU - Building Progress N/A Re-inspection required 11/2/2026 – Stop Work Order / Permit Hold

A Stop Work Order hold has been posted on the permit.

Unit #1 has been remodeled, and all work has been concealed. The property owner/contractor shall obtain the required permits for all work performed on the main house, including all applicable plumbing, electrical, and mechanical work.

The permit will not be closed out until the required permits have been obtained and approved, and all required inspections for Unit #1 have been completed and approved.

Photographs have been attached to the permit documenting the extent of the work observed from the exterior of the home.
11/02/2026 RSBU - Building Final N/A Partial Pass 11/2/26
Pending permit condition; air duct leakage test. Please request Building final after condition has been approved by City.

Completed Inspections

Permit Status: Stop Work Order
Permit Number: TC-RES-0626-03300
Permit Description: ADU
Total Completed Inspections - 13
Date Description Inspector Results Comments
09/03/2026 COT - RSPL - Yard Water Line Passed
09/03/2026 COT - RSPL - Rough Soil Passed
09/03/2026 COT - RSPL - Sewer Passed
09/08/2026 COT - RSBU - Excavation/Rebar/Zoning Passed
09/08/2026 COT - RSBU - Preslab Passed
09/21/2026 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed Passed
09/21/2026 COT - RSBU - Roof Nailing Passed Passed
09/25/2026 COT - RSEL - Grounding/Bonding Passed 09/25/2026
Ufer tied into main service panel.
09/25/2026 BULD - Electrical Clearance Passed 09/25/2026
Clearance TEP ECO.
10/28/2026 COT - RSEL - Electrical Final Passed
10/28/2026 COT - RSPL - Plumbing Final Passed
11/02/2026 COT - RSEL - Outdoor Lighting Passed
11/02/2026 COT - RSME - Mechanical Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
CONS-REBSUBMIT TC-RES-0626-03300-6271-E 25TH-6271-25TH-ST_V2.PDF DOCUMENTS VIEW