Inspection Status: Re-inspection required

Inspection History: RSBU - Building Progress

Date Description Inspector Results Comments
11/01/2026 RSBU - Building Progress Re-inspection required 11/2/2026 – Stop Work Order / Permit Hold

A Stop Work Order hold has been posted on the permit.

Unit #1 has been remodeled, and all work has been concealed. The property owner/contractor shall obtain the required permits for all work performed on the main house, including all applicable plumbing, electrical, and mechanical work.

The permit will not be closed out until the required permits have been obtained and approved, and all required inspections for Unit #1 have been completed and approved.

Photographs have been attached to the permit documenting the extent of the work observed from the exterior of the home.