Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Address NEW:
819 E 33RD ST UNIT 2
Apply Date:
06/18/2026
Applicant:
Greg Geile
Description:
ADU

Permit Reviews

Permit Number - TC-RES-0626-03298
Permit Status: Complete
Permit Description: ADU
Start Date Submittal Complete Date Status  
06/24/2026 RESIDENTIAL ADU v.1 07/01/2026 REQUIRES RESUBMIT Review Details
07/15/2026 RESIDENTIAL ADU v.2 07/24/2026 REQUIRES RESUBMIT Review Details
08/04/2026 RESIDENTIAL ADU v.3 08/10/2026 APPROVED Review Details

Conditions

Permit Number - TC-RES-0626-03298
Permit Status: Complete
Permit Description: ADU
Date Description Comments
08/06/2026 Pre-Issuance - Required Documents - Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
07/01/2026 Manual J to be submitted prior to intermediate inspection.

Completed Inspections

Permit Status: Complete
Permit Number: TC-RES-0626-03298
Permit Description: ADU
Total Completed Inspections - 15
Date Description Inspector Results Comments
08/24/2026 COT - RSPL - Sewer Passed Passed
08/31/2026 COT - RSBU - Preslab Passed Passed
08/31/2026 COT - RSBU - Excavation/Rebar/Zoning Passed Passed
09/09/2026 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
09/09/2026 COT - RSBU - Roof Nailing Passed
09/11/2026 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 9-11-26. All corrections were made during the time of inspection OK to proceed
09/11/2026 COT - RSEL - Grounding/Bonding Passed
09/11/2026 BULD - Electrical Clearance Passed 9-11-26 ECO Clearance approved
09/15/2026 COT - RSBU - Interior Shear Bracing Passed
10/20/2026 COT - RSEL - Electrical Final Passed 10/20/2026
Added paver to access disconnect st hot water heater and changed T&P drain to copper or CPVC rated for hot water.
10/20/2026 COT - RSME - Mechanical Final Passed 10/20/2026
Added paver to access disconnect atbhot water heater and changed T&P drain to copper or CPVC rated for hot water.
10/20/2026 COT - RSPL - Plumbing Final Passed 10/20/2026
Added paver to access disconnect st hot water heater and changed T&P drain to copper or CPVC rated for hot water.
10/20/2026 COT - RSPL - Rough Soil Passed 10/20/2026
Passed 8/2426. Duplicate.
10/20/2026 COT - RSPL - Yard Water Line Passed 10/20/2026
Passed 8/2426. Duplicate.
10/20/2026 RSBU - Building Final Passed 10/20/2026
Corrections made to access disconnect at water heater and T&P drain pipe rated. Uploaded Manual J calc to attachments to satisfy open condition.

Documents

File Name Document Type  
LOFC_LETTEROFCOMPLETION (SSRS).PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
CONS-REVISED PLANS 33RD ST-819-33RD-ST_V2.PDF DOCUMENTS VIEW
RESPONSE LETTER-2026-07-11_V1.PDF DOCUMENTS VIEW