Permit: TC-RES-0626-03298
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
819 E 33RD ST UNIT 2
Address NEW:
819 E 33RD ST UNIT 2
Apply Date:
06/18/2026
Applicant:
Greg Geile
Description:
ADU
Permit Reviews
Permit Number - TC-RES-0626-03298
Permit Status: Complete
Permit Description: ADU
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/24/2026 | RESIDENTIAL ADU v.1 | 07/01/2026 | REQUIRES RESUBMIT |
| 07/15/2026 | RESIDENTIAL ADU v.2 | 07/24/2026 | REQUIRES RESUBMIT |
| 08/04/2026 | RESIDENTIAL ADU v.3 | 08/10/2026 | APPROVED |
Conditions
Permit Number - TC-RES-0626-03298
Permit Status: Complete
Permit Description: ADU
| Date | Description | Comments |
|---|---|---|
| 08/06/2026 | Pre-Issuance - Required Documents - Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 07/01/2026 | Manual J to be submitted prior to intermediate inspection. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0626-03298
Permit Description: ADU
Total Completed Inspections - 15
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/24/2026 | COT - RSPL - Sewer | Passed | Passed | |
| 08/31/2026 | COT - RSBU - Preslab | Passed | Passed | |
| 08/31/2026 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Passed | |
| 09/09/2026 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 09/09/2026 | COT - RSBU - Roof Nailing | Passed | ||
| 09/11/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 9-11-26. All corrections were made during the time of inspection OK to proceed | |
| 09/11/2026 | COT - RSEL - Grounding/Bonding | Passed | ||
| 09/11/2026 | BULD - Electrical Clearance | Passed | 9-11-26 ECO Clearance approved | |
| 09/15/2026 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 10/20/2026 | COT - RSEL - Electrical Final | Passed | 10/20/2026 Added paver to access disconnect st hot water heater and changed T&P drain to copper or CPVC rated for hot water. |
|
| 10/20/2026 | COT - RSME - Mechanical Final | Passed | 10/20/2026 Added paver to access disconnect atbhot water heater and changed T&P drain to copper or CPVC rated for hot water. |
|
| 10/20/2026 | COT - RSPL - Plumbing Final | Passed | 10/20/2026 Added paver to access disconnect st hot water heater and changed T&P drain to copper or CPVC rated for hot water. |
|
| 10/20/2026 | COT - RSPL - Rough Soil | Passed | 10/20/2026 Passed 8/2426. Duplicate. |
|
| 10/20/2026 | COT - RSPL - Yard Water Line | Passed | 10/20/2026 Passed 8/2426. Duplicate. |
|
| 10/20/2026 | RSBU - Building Final | Passed | 10/20/2026 Corrections made to access disconnect at water heater and T&P drain pipe rated. Uploaded Manual J calc to attachments to satisfy open condition. |