Permit: TC-RES-0626-03002
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
2335 E ELM ST UNIT 2
Address NEW:
2335 E ELM ST UNIT 2
Apply Date:
06/05/2026
Applicant:
Katharine Kent
Description:
SolarAPP+ approved roof-mounted PV system (3.69 kW DC / 2.93 kW DC)
Permit Reviews
Permit Number - TC-RES-0626-03002
Permit Status: Complete
Permit Description: SolarAPP+ approved roof-mounted PV system (3.69 kW DC / 2.93 kW DC)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/05/2026 | RESIDENTIAL SOLAR v.1 | 06/16/2026 | REQUIRES RESUBMIT |
| 07/07/2026 | RESIDENTIAL SOLAR v.4 | N/A | APPROVED |
| 06/18/2026 | RESIDENTIAL SOLAR v.2 | N/A | REQUIRES RESUBMIT |
| 07/06/2026 | RESIDENTIAL SOLAR v.3 | 07/06/2026 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-RES-0626-03002
Permit Status: Complete
Permit Description: SolarAPP+ approved roof-mounted PV system (3.69 kW DC / 2.93 kW DC)
| Date | Description | Comments |
|---|---|---|
| 06/05/2026 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 06/16/2026 | Parcel is located within a regulatory floodplain. Engineering review required prior to issuance, floodplain use permit TE-FPU-0626-00244 must have fees paid prior to issuance |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0626-03002
Permit Description: SolarAPP+ approved roof-mounted PV system (3.69 kW DC / 2.93 kW DC)
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/08/2026 | BULD - Electrical Clearance | Passed | ||
| 07/08/2026 | COT - RSOL - Electrical Final Solar Project | Passed | ||
| 07/08/2026 | RSBU - Building Final | Passed |