Permit: TC-RES-0625-03105
Permit Details
Status:
Inspections Complete
Type:
Residential Building - One or Two Family
Address:
1470 W DELAWARE ST
Address NEW:
1470 W DELAWARE ST
Apply Date:
06/18/2025
Applicant:
Kelly Green
Description:
SFR
Permit Reviews
Permit Number - TC-RES-0625-03105
Permit Status: Inspections complete
Permit Description: SFR
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/10/2026 | RESIDENTIAL NEW DWELLING REVISION v.1 | 08/12/2026 | APPROVED |
| 07/09/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/14/2026 | APPROVED |
| 06/23/2025 | RESIDENTIAL NEW DWELLING v.1 | 07/23/2025 | REQUIRES RESUBMIT |
| 08/25/2025 | RESTAMP - RESIDENTIAL v.1 | 08/28/2025 | APPROVED |
| 07/24/2025 | RESIDENTIAL NEW DWELLING v.2 | 08/22/2025 | REQUIRES RESUBMIT |
| 08/25/2025 | RESIDENTIAL NEW DWELLING v.3 | 08/25/2025 | APPROVED |
Conditions
Permit Number - TC-RES-0625-03105
Permit Status: Inspections complete
Permit Description: SFR
| Date | Description | Comments |
|---|---|---|
| 08/27/2025 | Submit the Air Leakage & Duct Tightness Test Report completed by an Approved Special Inspector prior to Final Inspections. | |
| 06/23/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 06/23/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 07/14/2025 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-RES-0625-03105
Permite Description: SFR
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/10/2025 | COT - RSBU - Interior Shear Bracing | N/A | Not Applicable |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-RES-0625-03105
Permit Description: SFR
Total Completed Inspections - 14
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/30/2025 | COT - RSBU - Preslab | Passed | Complete placement of wire mesh and ensure slab area is termite treated | |
| 11/18/2025 | COT - RSBU - Roof Nailing | Passed | ||
| 11/18/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 11.18.25 Corrections made |
|
| 12/10/2025 | COT - RSPL - Sewer | Passed | ||
| 12/30/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Interior walls sheet rocked throughout. Unable to inspect Mechanical, Plumbing, Electric. Ok to tape and texture throughout. | |
| 02/24/2026 | BULD - Electrical Clearance | Passed | 2.24.26 Approved for incr code to TEP |
|
| 03/25/2026 | COT - RSPL - Yard Water Line | Passed | Okay to backfill. Shading required. 3/25/2026 | |
| 05/12/2026 | RSBU - Building Final | Passed | ||
| 05/12/2026 | COT - RSME - Mechanical Final | Passed | ||
| 06/26/2026 | COT - RSPL - Rough Soil | Passed | ||
| 06/26/2026 | COT - RSEL - Grounding/Bonding | Passed | ||
| 06/26/2026 | COT - RSEL - Outdoor Lighting | Passed | ||
| 06/26/2026 | COT - RSPL - Plumbing Final | Passed | ||
| 06/26/2026 | COT - RSBU - Excavation/Rebar/Zoning | Passed |