Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - RSBU - Exterior/Interior Clips/Sheathing/Framing
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/13/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Not Ready | All hold downs are undersized according to plan. Provide letter per engineer stating that the hold downs that are in place will suffice uplift. Provide double studs underneath at all 2ply girders trusses along with cripples studs. Jack truss J1 and J7 call for hangers on top cord. Proved H25 clips on both ends of H4 truss at bearing point under post near mechanical room. Missing bracing on truss H7. Missing bracing on truss H9. Missing bracing on trusses T2. Missing bracing on truss H15 and H14. Tighten all loose anchor bolts throughout. Add shot pins 6” from ends and every 24” at interior walls. Add double pins at bottom plates greater than 12”. Replace tightens that have been hammered in place. Remove bottom of osb to verify anchorage at post for header supports. Add more nails to sheathing due to over penetration. Nailing at sheathing not per schedule. STOPPED INSPECTION. Other items may apply. 11/13/2025 | |
| 11/18/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 11.18.25 Corrections made |