Permit: TC-RES-0624-03728
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
2866 W IRONWOOD HILL DR
Address NEW:
2866 W IRONWOOD HILL DR
Apply Date:
06/20/2024
Applicant:
Brittney Neely
Description:
Install for a 9.085 kW roof-mounted photovoltaic system with 200A MPU. REV1: Updated new MPU location. Updated new 125A MPU. Updated interconnection point with connectDER meter socket.
Permit Reviews
Permit Number - TC-RES-0624-03728
Permit Status: Complete
Permit Description: Install for a 9.085 kW roof-mounted photovoltaic system with 200A MPU.
REV1: Updated new MPU location. Updated new 125A MPU. Updated interconnection point with connectDER meter socket.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/20/2024 | RESIDENTIAL SOLAR v.1 | 07/24/2024 | APPROVED |
| 01/31/2025 | RESIDENTIAL SOLAR v.1 | 02/03/2025 | APPROVED |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-RES-0624-03728
Permite Description: Install for a 9.085 kW roof-mounted photovoltaic system with 200A MPU.
REV1: Updated new MPU location. Updated new 125A MPU. Updated interconnection point with connectDER meter socket.
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/05/2025 | BULD - Electrical Clearance | N/A | Partial Pass | 05 FEB 25 TEP CLEARANCE: INCR, Partial pass pending solar. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0624-03728
Permit Description: Install for a 9.085 kW roof-mounted photovoltaic system with 200A MPU.
REV1: Updated new MPU location. Updated new 125A MPU. Updated interconnection point with connectDER meter socket.
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/19/2025 | COT - RSOL - Grounding/Bonding Solar Project | Passed | ||
| 04/01/2025 | COT - RSOL - Electrical Final Solar Project | Passed | ||
| 04/01/2025 | RSBU - Building Final | Passed | ||
| 04/01/2025 | BULD - Electrical Clearance | Passed | Approved solar - DGC Clearance to TEP is required for the solar meter |