Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Apply Date:
06/20/2024
Applicant:
Brittney Neely
Description:
Install for a 9.085 kW roof-mounted photovoltaic system with 200A MPU. REV1: Updated new MPU location. Updated new 125A MPU. Updated interconnection point with connectDER meter socket.

Permit Reviews

Permit Number - TC-RES-0624-03728
Permit Status: Complete
Permit Description: Install for a 9.085 kW roof-mounted photovoltaic system with 200A MPU. REV1: Updated new MPU location. Updated new 125A MPU. Updated interconnection point with connectDER meter socket.
Start Date Submittal Complete Date Status  
06/20/2024 RESIDENTIAL SOLAR v.1 07/24/2024 APPROVED Review Details
01/31/2025 RESIDENTIAL SOLAR v.1 02/03/2025 APPROVED Review Details

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-RES-0624-03728
Permite Description: Install for a 9.085 kW roof-mounted photovoltaic system with 200A MPU. REV1: Updated new MPU location. Updated new 125A MPU. Updated interconnection point with connectDER meter socket.
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
02/05/2025 BULD - Electrical Clearance N/A Partial Pass 05 FEB 25
TEP CLEARANCE: INCR, Partial pass pending solar.

Completed Inspections

Permit Status: Complete
Permit Number: TC-RES-0624-03728
Permit Description: Install for a 9.085 kW roof-mounted photovoltaic system with 200A MPU. REV1: Updated new MPU location. Updated new 125A MPU. Updated interconnection point with connectDER meter socket.
Total Completed Inspections - 4
Date Description Inspector Results Comments
03/19/2025 COT - RSOL - Grounding/Bonding Solar Project Passed
04/01/2025 COT - RSOL - Electrical Final Solar Project Passed
04/01/2025 RSBU - Building Final Passed
04/01/2025 BULD - Electrical Clearance Passed Approved solar - DGC Clearance to TEP is required for the solar meter

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-REV2-MICHAEL WESNER_V1.PDF DOCUMENTS VIEW
REVISION LETTER_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-MICHAEL WESNER_V1.PDF DOCUMENTS VIEW