Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/05/2025 | BULD - Electrical Clearance | Partial Pass | 05 FEB 25 TEP CLEARANCE: INCR, Partial pass pending solar. |
|
| 02/20/2025 | BULD - Electrical Clearance | Canceled | CA by contractor | |
| 03/19/2025 | BULD - Electrical Clearance | Partial Pass | Partial for the 40A meter adapter - DGL Clearance was called into TEP Pending solar |
|
| 04/01/2025 | BULD - Electrical Clearance | Passed | Approved solar - DGC Clearance to TEP is required for the solar meter |