Permit Reviews
Permit Number - TC-RES-0623-06048
Permit Status: Complete
Permit Description: New Gunite Underground Swimming Pool
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/26/2023 | RESIDENTIAL NEW DWELLING v.1 | 07/12/2023 | REQUIRES RESUBMIT |
| 08/30/2023 | RESIDENTIAL NEW DWELLING v.3 | 09/11/2023 | REQUIRES RESUBMIT |
| 09/21/2023 | RESIDENTIAL NEW DWELLING v.4 | 09/21/2023 | APPROVED |
| 08/10/2023 | RESIDENTIAL NEW DWELLING v.2 | 08/10/2023 | REQUIRES RESUBMIT |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0623-06048
Permit Description: New Gunite Underground Swimming Pool
Total Completed Inspections - 12
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/29/2023 | Pool/Spa - Pre-Gunite | Passed | ||
| 12/15/2023 | COT - BULD - SWG Clearance | Passed | Okay to connect gas heater to main gas line. | |
| 12/15/2023 | Pool/Spa - Plumbing | Passed | Underground plumbing pipes from pool to pool equipment location is properly installed and under a water test. Okay to shade pipes and backfill trenches. | |
| 12/15/2023 | COT - RSEL - Electrical Final | Passed | Pool electrical conduit is installed from electrical panel to pool control box on house. Wiring is pulled, terminated, and proper breaker is installed in main electrical panel. | |
| 12/15/2023 | Pool/Spa - Bonding Grip | Passed | Pool equipment, lights, and electrical outlet is properly bonded and grounded. | |
| 12/15/2023 | Pool/Spa - Electric | Passed | Pool electrical conduit is installed from electrical panel to pool control box on house. Wiring is pulled, terminated, and proper breaker is installed in main electrical panel. Pool equipment is wired to an existing electrical panel. No clearance required. | |
| 12/15/2023 | Pool/Spa - Final/Barrier | Passed | All gates into pool area have the proper gate latches and self closing springs attached. All doors leading out into the pool area have working alarms attached. | |
| 12/15/2023 | Pool/Spa - Gas | Passed | gas line for pool heater is under air pressure testing with no leaks. okay to connect to main gas line. | |
| 12/15/2023 | RSBU - Building Final | Passed | Pool equipment is properly installed, pool and spa are complete with gunite and finish tiles. | |
| 12/15/2023 | Pool/Spa - Heater | Passed | Heater is installed and ready for connection to gas line, electrical power is trimmed out. | |
| 12/15/2023 | RSEL - Electrical Progress | Passed | ||
| 12/15/2023 | BULD - Electrical Clearance | Passed | Pool electrical conduit is installed from electrical panel to pool control box on house. Wiring is pulled, terminated, and proper breaker is installed in main electrical panel. Pool equipment is wired to an existing electrical panel. No clearance required. |