Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Address:
612 S 6TH AV
Address NEW:
612 S 6TH AV
Apply Date:
06/14/2023
Applicant:
Asia Philbin
Description:
Rear porch addition Wall and Gate at Street Carport

Permit Reviews

Permit Number - TC-RES-0623-05901
Permit Status: Complete
Permit Description: Rear porch addition Wall and Gate at Street Carport
Start Date Submittal Complete Date Status  
06/15/2023 RESIDENTIAL NEW DWELLING v.1 07/07/2023 REQUIRES RESUBMIT Review Details
08/18/2023 RESIDENTIAL NEW DWELLING v.2 08/29/2023 APPROVED Review Details

Conditions

Permit Number - TC-RES-0623-05901
Permit Status: Complete
Permit Description: Rear porch addition Wall and Gate at Street Carport
Date Description Comments
08/29/2023 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as a contact. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-RES-0623-05901
Permite Description: Rear porch addition Wall and Gate at Street Carport
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
08/23/2024 COT - RSBU - Stem Wall/Retaining Wall N/A Partial Pass Inspection is for slab of West side patio extension (4” slab). Ok to place Concrete in progress areas.

Completed Inspections

Permit Status: Complete
Permit Number: TC-RES-0623-05901
Permit Description: Rear porch addition Wall and Gate at Street Carport
Total Completed Inspections - 11
Date Description Inspector Results Comments
06/04/2024 COT - RSBU - Excavation/Rebar/Zoning Passed Ensure all footings are cleared of excess dirt and debris. Ok to place concrete in progress areas.
08/21/2024 COT - RSEL - Electrical Underground Passed Exterior conduits at 2” - 4” for new 200 amp panel and HVAC unit. Ok to cover progress areas.
04/10/2025 COT - RSBU - Masonry Pregrout Passed
04/10/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
04/10/2025 RSBU - Building Progress Passed
04/10/2025 COT - RSBU - Roof Nailing Passed
04/10/2025 COT - RSBU - Stem Wall/Retaining Wall Passed
04/10/2025 COT - RSBU - Preslab Passed
04/16/2025 RSBU - Building Final Passed 4-16-25, building final approved.
04/16/2025 COT - RSEL - Outdoor Lighting Passed 4-16-25, outdoor lighting approved.
04/16/2025 COT - RSEL - Electrical Final Passed 4-16-25, electrical final approved.

Documents

File Name Document Type  
0760_001_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-TC_RES_0623_05901_REV2_V2.PDF DOCUMENTS VIEW
MISC. - WOODRUFF - PHILBIN-ROED STEEL PORCHES_V1.PDF DOCUMENTS VIEW