Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-RES-0623-05743
Permit Details
Status:
Inspections Complete
Type:
Residential Building - One or Two Family
Address:
3144 E VIA PALOS VERDES
Apply Date:
06/07/2023
Applicant:
TFS Solar
Description:
Roof mount 17.12 kW DC photovoltaic solar system, 40 AC modules, 4 branches, PV subpanel, interconnect via load side subpanel feeder tap 40 modules
Permit Reviews
Permit Number - TC-RES-0623-05743
Permit Status: Inspections complete
Permit Description: Roof mount 17.12 kW DC photovoltaic solar system, 40 AC modules, 4 branches, PV subpanel, interconnect via load side subpanel feeder tap
40 modules
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
06/08/2023 | RESIDENTIAL SOLAR v.1 | 07/03/2023 | APPROVED |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-RES-0623-05743
Permite Description: Roof mount 17.12 kW DC photovoltaic solar system, 40 AC modules, 4 branches, PV subpanel, interconnect via load side subpanel feeder tap
40 modules
Total Outstanding Inspections - 2
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/08/2023 | BULD - Electrical Clearance | N/A | Re-inspection required | NR, main panel shall not be used as junction box for service panel of detached building, Polaris plug connections can be installed through the gutter, *Note: the solar installation is per plan and can be cleared when main panel is corrected |
11/08/2023 | COT - RSOL - Electrical Final Solar Project | N/A | Re-inspection required |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-RES-0623-05743
Permit Description: Roof mount 17.12 kW DC photovoltaic solar system, 40 AC modules, 4 branches, PV subpanel, interconnect via load side subpanel feeder tap
40 modules
Total Completed Inspections - 3
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/13/2023 | BULD - Electrical Clearance | Passed | Approved, DGC Clearance to TEP is required for the solar meter | |
11/13/2023 | RSBU - Building Final | Passed | ||
11/13/2023 | COT - RSOL - Electrical Final Solar Project | Passed |