Permit: TC-RES-0526-02791
Permit Details
Status:
Inspections
Type:
Residential Building - One or Two Family
Address:
1075 N CANYON MOONLIGHT PL
Address NEW:
1075 N CANYON MOONLIGHT PL
Apply Date:
05/27/2026
Applicant:
vance goodman
Description:
THIS PROJECT IS A NEW 91'-0" LONG x 6'-0" TALL RETAINING CMU YARD WALL.
Permit Reviews
Permit Number - TC-RES-0526-02791
Permit Status: Inspections
Permit Description: THIS PROJECT IS A NEW 91'-0" LONG x 6'-0" TALL RETAINING CMU YARD WALL.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/08/2026 | ADMINISTRATIVE v.1 | N/A | REQUIRES RESUBMIT |
| 07/07/2026 | RESIDENTIAL FENCE/WALL v.2 | 07/08/2026 | APPROVED |
| 06/02/2026 | RESIDENTIAL FENCE/WALL v.1 | 06/15/2026 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-RES-0526-02791
Permit Status: Inspections
Permit Description: THIS PROJECT IS A NEW 91'-0" LONG x 6'-0" TALL RETAINING CMU YARD WALL.
| Date | Description | Comments |
|---|---|---|
| 06/15/2026 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-RES-0526-02791
Permite Description: THIS PROJECT IS A NEW 91'-0" LONG x 6'-0" TALL RETAINING CMU YARD WALL.
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/19/2026 | COT - RSBU - Stem Wall/Retaining Wall | N/A | Partial Pass | Footer trench is compacted and dimensions are correct to detail 2 and plan. When footer reinforcing is ready reschedule this inspection again for approval before pouring footer. |
| 09/08/2026 | ENGR Engineering Final | N/A | Partial Pass | Footer Reinforcing is correct. OK to pour footer schedule next inspection prior to grout for first lift so I can check bond beam. |