Permit: TC-RES-0526-02511
Permit Details
Status:
In Revision
Type:
Residential Building - One or Two Family
Address:
20 E CALLE DE FELICIDAD
Address NEW:
20 E CALLE DE FELICIDAD
Apply Date:
05/13/2026
Applicant:
John Clelland
Description:
REV_1 (10/14/2026) Relocate water heater and air handler. Rough in for future pool bath and 1/2 bath.
Permit Reviews
Permit Number - TC-RES-0526-02511
Permit Status: In revision
Permit Description: REV_1 (10/14/2026)
Relocate water heater and air handler. Rough in for future pool bath and 1/2 bath.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/14/2026 | RESIDENTIAL ADD/ALT SIMPLE REVIEW REVISION v.1 | N/A | IN REVIEW |
| 05/13/2026 | RESIDENTIAL ADD/ALT v.1 | 05/21/2026 | APPROVED |
Conditions
Permit Number - TC-RES-0526-02511
Permit Status: In revision
Permit Description: REV_1 (10/14/2026)
Relocate water heater and air handler. Rough in for future pool bath and 1/2 bath.
| Date | Description | Comments |
|---|---|---|
| 05/13/2026 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Completed Inspections
Permit Status: In Revision
Permit Number: TC-RES-0526-02511
Permit Description: REV_1 (10/14/2026)
Relocate water heater and air handler. Rough in for future pool bath and 1/2 bath.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/01/2026 | COT - RSPL - Rough Soil | Passed | 07/01/2026 Approved per plan. Holding under test - okay to backfill, shading required. |
|
| 10/12/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Ok to proceed at own risk pending approval of new site plan, adjustments match new plans pending review | |
| 10/12/2026 | COT - RSPL - Gas Pressure Test | Passed | Passed |