Permit: TC-RES-0525-02582
Permit Details
Status:
Inspections
Type:
Residential Building - One or Two Family
Address:
5362 E 4TH ST
Address NEW:
5362 E 4TH ST
Apply Date:
05/15/2025
Applicant:
GGV Designs
Description:
Renovate SFR for code compliance for work without permit
Permit Reviews
Permit Number - TC-RES-0525-02582
Permit Status: Inspections
Permit Description: Renovate SFR for code compliance for work without permit
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/18/2026 | RESIDENTIAL NEW DWELLING v.3 | 03/05/2026 | REQUIRES RESUBMIT |
| 07/01/2025 | RESIDENTIAL NEW DWELLING v.2 | 07/01/2025 | REQUIRES RESUBMIT |
| 05/19/2025 | RESIDENTIAL NEW DWELLING v.1 | 06/20/2025 | REQUIRES RESUBMIT |
| 04/09/2026 | RESIDENTIAL NEW DWELLING v.4 | 04/22/2026 | APPROVED |
Conditions
Permit Number - TC-RES-0525-02582
Permit Status: Inspections
Permit Description: Renovate SFR for code compliance for work without permit
| Date | Description | Comments |
|---|---|---|
| 05/19/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-RES-0525-02582
Permite Description: Renovate SFR for code compliance for work without permit
Total Outstanding Inspections - 8
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/26/2026 | COT - RSBU - Roof Nailing | N/A | Re-inspection required | 10/26/2026 Expose and dig footers at one location to verify foundation at addition (bedroom 8 & 9), see detail S1-3. Expose drywall at hallway at top and bottom to verify framing and roof assembly. Kitchen countertops should be GFCI protected. All 15A and 20A habitable rooms and hallway need AFCI protected breakers at Panel C. Secure AC condenser unit outside to pad. |
| 10/26/2026 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | N/A | Re-inspection required | 10/26/2026 Expose and dig footers at one location to verify foundation at addition (bedroom 8 & 9), see detail S1-3. Expose drywall at hallway at top and bottom to verify framing and roof assembly. Kitchen countertops should be GFCI protected. All 15A and 20A habitable rooms and hallway need AFCI protected breakers at Panel C. Secure AC condenser unit outside to pad. |
| 10/26/2026 | COT - RSME - Mechanical Final | N/A | Re-inspection required | 10/26/2026 Expose and dig footers at one location to verify foundation at addition (bedroom 8 & 9), see detail S1-3. Expose drywall at hallway at top and bottom to verify framing and roof assembly. Kitchen countertops should be GFCI protected. All 15A and 20A habitable rooms and hallway need AFCI protected breakers at Panel C. Secure AC condenser unit outside to pad. |
| 10/26/2026 | COT - RSEL - Electrical Final | N/A | Re-inspection required | 10/26/2026 Expose and dig footers at one location to verify foundation at addition (bedroom 8 & 9), see detail S1-3. Expose drywall at hallway at top and bottom to verify framing and roof assembly. Kitchen countertops should be GFCI protected. All 15A and 20A habitable rooms and hallway need AFCI protected breakers at Panel C. Secure AC condenser unit outside to pad. |
| 10/26/2026 | COT - RSBU - Preslab | N/A | Re-inspection required | 10/26/2026 Expose and dig footers at one location to verify foundation at addition (bedroom 8 & 9), see detail S1-3. Expose drywall at hallway at top and bottom to verify framing and roof assembly. Kitchen countertops should be GFCI protected. All 15A and 20A habitable rooms and hallway need AFCI protected breakers at Panel C. Secure AC condenser unit outside to pad. |
| 10/26/2026 | RSBU - Building Final | N/A | Re-inspection required | 10/26/2026 Expose and dig footers at one location to verify foundation at addition (bedroom 8 & 9), see detail S1-3. Expose drywall at hallway at top and bottom to verify framing and roof assembly. Kitchen countertops should be GFCI protected. All 15A and 20A habitable rooms and hallway need AFCI protected breakers at Panel C. Secure AC condenser unit outside to pad. |
| 10/26/2026 | COT - RSPL - Plumbing Final | N/A | Re-inspection required | 10/26/2026 Expose and dig footers at one location to verify foundation at addition (bedroom 8 & 9), see detail S1-3. Expose drywall at hallway at top and bottom to verify framing and roof assembly. Kitchen countertops should be GFCI protected. All 15A and 20A habitable rooms and hallway need AFCI protected breakers at Panel C. Secure AC condenser unit outside to pad. |
| 10/26/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Re-inspection required | 10/26/2026 Expose and dig footers at one location to verify foundation at addition (bedroom 8 & 9), see detail S1-3. Expose drywall at hallway at top and bottom to verify framing and roof assembly. Kitchen countertops should be GFCI protected. All 15A and 20A habitable rooms and hallway need AFCI protected breakers at Panel C. Secure AC condenser unit outside to pad. |