Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/26/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | 10/26/2026 Expose and dig footers at one location to verify foundation at addition (bedroom 8 & 9), see detail S1-3. Expose drywall at hallway at top and bottom to verify framing and roof assembly. Kitchen countertops should be GFCI protected. All 15A and 20A habitable rooms and hallway need AFCI protected breakers at Panel C. Secure AC condenser unit outside to pad. |