Permit: TC-RES-0525-02573
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
9580 E MAGDALENA RD
Address NEW:
9580 E MAGDALENA RD
Apply Date:
05/14/2025
Applicant:
Joseph Maher
Description:
Guest House
Permit Reviews
Permit Number - TC-RES-0525-02573
Permit Status: Complete
Permit Description: Guest House
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/15/2025 | RESIDENTIAL NEW DWELLING v.1 | 06/17/2025 | APPROVED |
| 07/18/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/18/2025 | APPROVED |
Conditions
Permit Number - TC-RES-0525-02573
Permit Status: Complete
Permit Description: Guest House
| Date | Description | Comments |
|---|---|---|
| 05/15/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 06/05/2025 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-RES-0525-02573
Permite Description: Guest House
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/04/2025 | COT - RSBU - Interior Shear Bracing | N/A | Not Applicable | N/A |
| 08/04/2025 | RSBU - Building Progress | N/A | Not Applicable |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0525-02573
Permit Description: Guest House
Total Completed Inspections - 13
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/25/2025 | COT - RSPL - Sewer | Passed | Passed 6/25/25 ok to backfill | |
| 07/02/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Passed 7/2/25 ok to pour concrete | |
| 07/02/2025 | COT - RSBU - Preslab | Passed | Passed 7/2/25 ok to pour concrete | |
| 07/02/2025 | COT - RSPL - Rough Soil | Passed | Passed 7/2/25 ok to pour concrete | |
| 07/25/2025 | COT - RSEL - Electrical Underground | Passed | ||
| 07/31/2025 | COT - RSPL - Yard Water Line | Passed | ||
| 08/14/2025 | COT - RSBU - Roof Nailing | Passed | See previous notes, h25 clips at sil plate not nailed properly/missing nails, sil plate at marked area west wall needed anchor bolt, not shot pin | |
| 08/18/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 8-18-25: exterior clips/sheathing approved-okay to continue with construction. | |
| 09/03/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 9/3/25 Pass, please make sure home design ordinance is followed on page A1. |
|
| 10/15/2025 | RSBU - Building Final | Passed | gate key is inside lk bx at gas meter code is 1234. Gate is on west side of garage and new construction is at back of house. Call 520-331-6773 prior to arrival so someone can be on site. | |
| 10/15/2025 | COT - RSEL - Electrical Final | Passed | ||
| 10/15/2025 | COT - RSME - Mechanical Final | Passed | ||
| 10/15/2025 | COT - RSPL - Plumbing Final | Passed |