Permit: TC-RES-0525-02497
Permit Details
Status:
Needs Resubmittal
Type:
Residential Building - One or Two Family
Address:
4641 E BURNS ST UNIT 2
Address NEW:
4641 E BURNS ST UNIT 2
Apply Date:
05/09/2025
Applicant:
Connor Lewis
Description:
ADU
Permit Reviews
Permit Number - TC-RES-0525-02497
Permit Status: Needs resubmittal
Permit Description: ADU
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/04/2025 | ADMINISTRATIVE v.2 | 09/04/2025 | APPROVED |
| 05/12/2025 | RESIDENTIAL NEW DWELLING v.1 | 06/16/2025 | REQUIRES RESUBMIT |
| 09/03/2025 | ADMINISTRATIVE v.1 | 09/03/2025 | REQUIRES RESUBMIT |
| 07/25/2025 | RESIDENTIAL NEW DWELLING v.2 | 08/05/2025 | REQUIRES RESUBMIT |
| 09/03/2025 | RESIDENTIAL NEW DWELLING v.3 | 09/03/2025 | APPROVED |
| 08/13/2026 | RESIDENTIAL ADU REVISION v.2 | N/A | REQUIRES RESUBMIT |
| 02/05/2026 | RESIDENTIAL ADU REVISION v.1 | 02/05/2026 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TC-RES-0525-02497
Permit Status: Needs resubmittal
Permit Description: ADU
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 06/05/2025 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Conditions
Permit Number - TC-RES-0525-02497
Permit Status: Needs resubmittal
Permit Description: ADU
| Date | Description | Comments |
|---|---|---|
| 06/05/2025 | Please contact Pima County Addressing to resolve issue. Addressing@pima.gov or 520-724-9512 | |
| 05/12/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 08/05/2025 |
Outstanding Inspections
Permit Status: Needs Resubmittal
Permit Number: TC-RES-0525-02497
Permite Description: ADU
Total Outstanding Inspections - 5
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/22/2025 | COT - RSEL - Electrical Underground | N/A | Partial Pass | Under slab conduit approved. Pending risers from old to new locations. 9/22/2025 |
| 10/28/2025 | COT - RSBU - Masonry Pregrout | N/A | Re-inspection required | 10-28-25: contractor to reschedule-missing verticals at 24"o.c. |
| 07/10/2026 | COT - SITE - Zoning Intermediate | N/A | Not Ready | Plan revision needs to be completed prior to this Zoning inspection to reflect constructed height of 14’. |
| 07/10/2026 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
| 07/10/2026 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable |
Completed Inspections
Permit Status: Needs Resubmittal
Permit Number: TC-RES-0525-02497
Permit Description: ADU
Total Completed Inspections - 15