Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-RES-0524-03026
Permit Details
Status:
Inspections Complete
Type:
Residential Building - One or Two Family
Address:
1321 N ECHO PL
Address NEW:
1321 N ECHO PL
Apply Date:
05/19/2024
Applicant:
Herb Unruh
Description:
Build back porch
Permit Reviews
Permit Number - TC-RES-0524-03026
Permit Status: Inspections complete
Permit Description: Build back porch
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/15/2024 | RESIDENTIAL NEW DWELLING v.2 | 09/13/2024 | REQUIRES RESUBMIT |
| 09/26/2024 | RESIDENTIAL NEW DWELLING v.3 | 10/11/2024 | REQUIRES RESUBMIT |
| 10/29/2024 | RESIDENTIAL NEW DWELLING v.4 | 11/13/2024 | APPROVED |
| 05/21/2024 | RESIDENTIAL NEW DWELLING v.1 | 06/18/2024 | REQUIRES RESUBMIT |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-RES-0524-03026
Permite Description: Build back porch
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/07/2025 | COT - RSBU - Roof Nailing | N/A | Partial Pass | 2/7/25 check for weak spots and add blocking, I marked a few places but there are probably more. Partial pass |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-RES-0524-03026
Permit Description: Build back porch
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/13/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Partial pass. Plans call for an 8" toe down. Remove all loose fill from footers. 12/12/2024 12/13/24: corrections made ok to proceed with concrete placement |
|
| 12/13/2024 | COT - RSBU - Preslab | Passed | Partial pass. Plans call for an 8" toe down. Remove all loose fill from footers. 12/12/2024 12/13/24: corrections made ok to proceed with concrete placement |
|
| 02/07/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 2/7/25 pass | |
| 02/07/2025 | COT - RSBU - Roof Nailing | Passed | 2/7/25 contractor made corrections, I was able to verify over video. Pass | |
| 02/25/2025 | RSBU - Building Final | Passed | Passed final inspection 2/25/25 |