Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Preslab
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/12/2024 | COT - RSBU - Preslab | Re-inspection required | Partial pass. Plans call for an 8" toe down. Remove all loose fill from footers. 12/12/2024 | |
| 12/13/2024 | COT - RSBU - Preslab | Passed | Partial pass. Plans call for an 8" toe down. Remove all loose fill from footers. 12/12/2024 12/13/24: corrections made ok to proceed with concrete placement |