Permit: TC-RES-0524-02709
Permit Details
Apply Date:
05/03/2024
Applicant:
Timothy Robertson
Description:
SFR
Permit Reviews
Permit Number - TC-RES-0524-02709
Permit Status: Issued
Permit Description: SFR
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
05/13/2024 | RESIDENTIAL NEW DWELLING v.1 | 06/11/2024 | REQUIRES RESUBMIT |
09/19/2024 | RESIDENTIAL NEW DWELLING v.2 | 10/21/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-RES-0524-02709
Permit Status: Issued
Permit Description: SFR
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
09/25/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
Conditions
Permit Number - TC-RES-0524-02709
Permit Status: Issued
Permit Description: SFR
Date | Description | Comments |
---|---|---|
11/06/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
05/23/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-RES-0524-02709
Permite Description: SFR
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/04/2024 | COT - RSPL - Sewer | N/A | Partial Pass | 11/4/24: plumbing underground per plans and under test ok to proceed. Pending sewer connection. |
Completed Inspections
Permit Status: Issued
Permit Number: TC-RES-0524-02709
Permit Description: SFR
Total Completed Inspections - 1
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/04/2024 | COT - RSPL - Rough Soil | Passed | 11/4/24: plumbing underground per plans and under test ok to proceed. |