Permit: TC-RES-0523-05587
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
2026 N BAXTER DR
Address NEW:
2026 N BAXTER DR
Apply Date:
05/31/2023
Applicant:
Justin Kolb
Description:
Master Suite, Dining Room Addition and Porch
Permit Reviews
Permit Number - TC-RES-0523-05587
Permit Status: Complete
Permit Description: Master Suite, Dining Room Addition and Porch
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/14/2023 | RESIDENTIAL NEW DWELLING v.2 | 08/01/2023 | APPROVED |
| 10/11/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 10/25/2023 | APPROVED |
| 06/02/2023 | RESIDENTIAL NEW DWELLING v.1 | 06/26/2023 | REQUIRES RESUBMIT |
| 09/22/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/22/2023 | APPROVED |
| 10/09/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/09/2023 | REQUIRES RESUBMIT |
| 08/01/2023 | RESTAMP - RESIDENTIAL v.1 | 08/01/2023 | APPROVED |
Conditions
Permit Number - TC-RES-0523-05587
Permit Status: Complete
Permit Description: Master Suite, Dining Room Addition and Porch
| Date | Description | Comments |
|---|---|---|
| 06/26/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-RES-0523-05587
Permite Description: Master Suite, Dining Room Addition and Porch
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/19/2023 | COT - RSPL - Rough Soil | N/A | Partial Pass | 9/19/23: rough soil for new addition approved. |
| 09/19/2023 | COT - RSBU - Excavation/Rebar/Zoning | N/A | Partial Pass | 9/19/23: footing for three piers and stem wall approved. |
| 09/25/2023 | COT - RSBU - Masonry Pregrout | N/A | Partial Pass | 1st lift of columns. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0523-05587
Permit Description: Master Suite, Dining Room Addition and Porch
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/25/2023 | COT - RSBU - Preslab | Passed | ||
| 10/17/2023 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 11/02/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 02/21/2024 | RSBU - Building Final | Passed | Construction is complete. Mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled. Exterior outlets are GFCI Protected, bedroom outlets are on an AFCI Breaker. Okay to issue Certificate of Completion for this permit. |