Permit: TC-RES-0426-02280
Permit Details
Status:
Inspections
Type:
Residential Building - One or Two Family
Address:
6396 S BRIGHT SUN AV
Address NEW:
6396 S BRIGHT SUN AV
Apply Date:
04/30/2026
Applicant:
lindsay A Kaslavage
Description:
Master: Converting tub to shower - replacing tub, drain, and valves. Guest - Converting tub to shower - replacing tub, drain, and valves.
Permit Reviews
Permit Number - TC-RES-0426-02280
Permit Status: Inspections
Permit Description: Master: Converting tub to shower - replacing tub, drain, and valves.
Guest - Converting tub to shower - replacing tub, drain, and valves.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/04/2026 | RESIDENTIAL ADD/ALT v.1 | 05/11/2026 | APPROVED |
Conditions
Permit Number - TC-RES-0426-02280
Permit Status: Inspections
Permit Description: Master: Converting tub to shower - replacing tub, drain, and valves.
Guest - Converting tub to shower - replacing tub, drain, and valves.
| Date | Description | Comments |
|---|---|---|
| 05/04/2026 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-RES-0426-02280
Permite Description: Master: Converting tub to shower - replacing tub, drain, and valves.
Guest - Converting tub to shower - replacing tub, drain, and valves.
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/22/2026 | RSBU - Building Final | N/A | Partial Pass | 05/22/2026 Verified guest bathroom holding under test, lines secure. Partial pending work to primary bathroom. |
| 05/29/2026 | COT - RSPL - Plumbing Final | N/A | Partial Pass | 5-29-26: master bathroom holding under test, however, fire foam all penetrations at floor decking, at vent penetration above ceiling and fire foam around the chute at head end of shower. Secure vent using a clamp or strap. Take a video of required corrections and provide that on the upcoming inspection. Replace defective pan and note that a water tight test will be required at finals. The drain will be plugged and the pan will be filled with to the threshold ( at least 2" of water) for a minimum of 15 minutes. |