Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: TC-RES-0426-02280

Parcel: 140295540

Inspection Status: Partial Pass

Inspection History: COT - RSPL - Plumbing Final 

Date Description Inspector Results Comments
05/22/2026 COT - RSPL - Plumbing Final  Partial Pass 05/22/2026
Verified guest bathroom holding under test, lines secure. Partial pending work to primary bathroom.
05/29/2026 COT - RSPL - Plumbing Final  Partial Pass 5-29-26: master bathroom holding under test, however, fire foam all penetrations at floor decking, at vent penetration above ceiling and fire foam around the chute at head end of shower. Secure vent using a clamp or strap. Take a video of required corrections and provide that on the upcoming inspection. Replace defective pan and note that a water tight test will be required at finals. The drain will be plugged and the pan will be filled with to the threshold ( at least 2" of water) for a minimum of 15 minutes.