Permit: TC-RES-0426-01955
Permit Details
Status:
Inspections Complete
Type:
Residential Building - One or Two Family
Address:
9780 E SANDCASTLE CT
Address NEW:
9780 E SANDCASTLE CT
Apply Date:
04/17/2026
Applicant:
Tina Wilson
Description:
IN GROUND POOL WITH EQUIPMENT
Permit Reviews
Permit Number - TC-RES-0426-01955
Permit Status: Inspections complete
Permit Description: IN GROUND POOL WITH EQUIPMENT
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/17/2026 | RESIDENTIAL POOL v.1 | 04/28/2026 | APPROVED |
Conditions
Permit Number - TC-RES-0426-01955
Permit Status: Inspections complete
Permit Description: IN GROUND POOL WITH EQUIPMENT
| Date | Description | Comments |
|---|---|---|
| 04/17/2026 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-RES-0426-01955
Permite Description: IN GROUND POOL WITH EQUIPMENT
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/26/2026 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
| 06/26/2026 | Pool/Spa - Plumbing | N/A | Canceled | |
| 06/26/2026 | RSBU - Building Final | N/A | Canceled |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-RES-0426-01955
Permit Description: IN GROUND POOL WITH EQUIPMENT
Total Completed Inspections - 9
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/06/2026 | PDSD Building Division Pre-Construction Meeting | Passed | ||
| 05/27/2026 | Pool/Spa - Bonding Grip | Passed | ||
| 05/27/2026 | Pool/Spa - Pre-Gunite | Passed | ||
| 05/27/2026 | RSEL - Electrical Progress | Passed | ||
| 06/26/2026 | COT - RSEL - Electrical Final | Passed | Passed | |
| 06/26/2026 | Pool/Spa - Electric | Passed | Passed | |
| 06/26/2026 | Pool/Spa - Final/Barrier | Passed | Passed | |
| 06/30/2026 | Pool/Spa - Plumbing | Passed | Correction made | |
| 06/30/2026 | RSBU - Building Final | Passed | Correction made |