Permit: TC-RES-0426-01841
Permit Details
Status:
Approved - Awaiting Customer Attention
Type:
Residential Building - One or Two Family
Address:
5050 S 1ST AV
Address NEW:
5050 S 1ST AV
Apply Date:
04/13/2026
Applicant:
Fernando Hinojosa
Description:
Single Family Residence
Permit Reviews
Permit Number - TC-RES-0426-01841
Permit Status: Approved - awaiting customer attention
Permit Description: Single Family Residence
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/15/2026 | RESIDENTIAL NEW DWELLING v.1 | 04/28/2026 | REQUIRES RESUBMIT |
| 10/14/2026 | ADMINISTRATIVE v.2 | 10/14/2026 | REQUIRES RESUBMIT |
| 10/06/2026 | ADMINISTRATIVE v.1 | 10/06/2026 | REQUIRES RESUBMIT |
| 10/05/2026 | RESIDENTIAL NEW DWELLING v.3 | 10/06/2026 | APPROVED |
| 09/01/2026 | RESIDENTIAL NEW DWELLING v.2 | 09/09/2026 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TC-RES-0426-01841
Permit Status: Approved - awaiting customer attention
Permit Description: Single Family Residence
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 04/16/2026 | Submit the Air Leakage & Duct Tightness Test Report completed by an Approved Special Inspector prior to Final Inspections. |
| 04/16/2026 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. |
| 04/16/2026 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
| 08/14/2026 | Prior to Inspections - Required Documents - An intermediate Elevation Certificate is required PRIOR TO GRADING and/or PRE-SLAB INSPECTION. |
| 08/14/2026 | Submission of the final Elevation Certificate and completion of the Floodplain Use Permit is required PRIOR TO FINALING this permit. |
Conditions
Permit Number - TC-RES-0426-01841
Permit Status: Approved - awaiting customer attention
Permit Description: Single Family Residence
| Date | Description | Comments |
|---|---|---|
| 04/15/2026 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 04/16/2026 | Manual J report | |
| 08/14/2026 | Parcel is located within a regulatory floodplain. Floodplain use permit TE-FPU-0726-00316 must be paid prior to issuance. |