Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Address:
1917 E 4TH ST
Address NEW:
1917 E 4TH ST
Apply Date:
04/14/2025
Applicant:
TFS Solar
Description:
Roof mount 9.14 kW DC photovoltaic solar system; 21 modules; 13.5 kWh Storage, 1 Tesla Powerwall-3 battery with integrated PV inverter with 4 strings. 200A bus with 200A MCB, interconnection via PCS, Tesla Backup Switch for whole home backup.

Permit Reviews

Permit Number - TC-RES-0425-01941
Permit Status: Complete
Permit Description: Roof mount 9.14 kW DC photovoltaic solar system; 21 modules; 13.5 kWh Storage, 1 Tesla Powerwall-3 battery with integrated PV inverter with 4 strings. 200A bus with 200A MCB, interconnection via PCS, Tesla Backup Switch for whole home backup.
Start Date Submittal Complete Date Status  
04/15/2025 RESIDENTIAL SOLAR v.1 05/29/2025 APPROVED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: TC-RES-0425-01941
Permit Description: Roof mount 9.14 kW DC photovoltaic solar system; 21 modules; 13.5 kWh Storage, 1 Tesla Powerwall-3 battery with integrated PV inverter with 4 strings. 200A bus with 200A MCB, interconnection via PCS, Tesla Backup Switch for whole home backup.
Total Completed Inspections - 3
Date Description Inspector Results Comments
07/03/2025 BULD - Electrical Clearance Passed 6/17/25
TEP CLEARANCE: DGL, Tesla backup switch. Called TEP @ 10:04. Partial pass pending solar
7.3.25
PV system installed per plans. Proper conductors throughout. Grounding/bonding verified. Neutrals marked. Lugs torqued to spec. Address label on site. Labels verified at panel faces and conduits. Schedule verified. DGC/DGL/BAT CLEARANCE TO TEP
07/03/2025 RSBU - Building Final Passed 7.3.25
PV system installed per plans. Proper conductors throughout. Grounding/bonding verified. Neutrals marked. Lugs torqued to spec. Address label on site. Labels verified at panel faces and conduits. Schedule verified. DGC/DGL/BAT CLEARANCE TO TEP
07/03/2025 COT - RSOL - Electrical Final Solar Project Passed 6/17/25
TEP CLEARANCE: DGL, Tesla backup switch. Called TEP @ 10:04. Partial pass pending solar
7.3.25
PV system installed per plans. Proper conductors throughout. Grounding/bonding verified. Neutrals marked. Lugs torqued to spec. Address label on site. Labels verified at panel faces and conduits. Schedule verified. DGC/DGL/BAT CLEARANCE TO TEP

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-JASTRAZB, ANDREA PV 9.14KW STORAGE 13.5KWH-DRAWINGS_V1.PDF DOCUMENTS VIEW
JASTRAZB, ANDREA PV 9.14KW STORAGE 13.5KWH-SPECS_V1.PDF DOCUMENTS VIEW