Inspection History Details
Inspection Status: Passed
Inspection History: COT - RSOL - Electrical Final Solar Project
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/03/2025 | COT - RSOL - Electrical Final Solar Project | Passed | 6/17/25 TEP CLEARANCE: DGL, Tesla backup switch. Called TEP @ 10:04. Partial pass pending solar 7.3.25 PV system installed per plans. Proper conductors throughout. Grounding/bonding verified. Neutrals marked. Lugs torqued to spec. Address label on site. Labels verified at panel faces and conduits. Schedule verified. DGC/DGL/BAT CLEARANCE TO TEP |