Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Address:
1706 E COPPER ST
Address NEW:
1706 E COPPER ST
Apply Date:
04/13/2025
Applicant:
Hailey McGaw
Description:
4800W DC, 14400W AC, 5.00 kWh ENERGY STORAGE SYSTEM (1)ENPHASE IQ BATTERY 5P (IQBATTERY-5P-1P-NA) (1)ENPHASE IQ SYSTEM CONTROLLER 3 (SC200D111C240US01) (45) SILFAB SIL-400HC+ (400W) (45) ENPHASE IQ8MC-72-M-US

Permit Reviews

Permit Number - TC-RES-0425-01919
Permit Status: Complete
Permit Description: 4800W DC, 14400W AC, 5.00 kWh ENERGY STORAGE SYSTEM (1)ENPHASE IQ BATTERY 5P (IQBATTERY-5P-1P-NA) (1)ENPHASE IQ SYSTEM CONTROLLER 3 (SC200D111C240US01) (45) SILFAB SIL-400HC+ (400W) (45) ENPHASE IQ8MC-72-M-US
Start Date Submittal Complete Date Status  
05/27/2025 RESIDENTIAL SOLAR v.2 06/10/2025 APPROVED Review Details
04/14/2025 RESIDENTIAL SOLAR v.1 05/19/2025 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TC-RES-0425-01919
Permit Status: Complete
Permit Description: 4800W DC, 14400W AC, 5.00 kWh ENERGY STORAGE SYSTEM (1)ENPHASE IQ BATTERY 5P (IQBATTERY-5P-1P-NA) (1)ENPHASE IQ SYSTEM CONTROLLER 3 (SC200D111C240US01) (45) SILFAB SIL-400HC+ (400W) (45) ENPHASE IQ8MC-72-M-US
Total Outstanding Activity Conditions - 1
Date Name
05/07/2025 SPECIAL INSPECTION FOR PILING, DRILLED PIERS AND CAISSONS IS REQUIRED.

Conditions

Permit Number - TC-RES-0425-01919
Permit Status: Complete
Permit Description: 4800W DC, 14400W AC, 5.00 kWh ENERGY STORAGE SYSTEM (1)ENPHASE IQ BATTERY 5P (IQBATTERY-5P-1P-NA) (1)ENPHASE IQ SYSTEM CONTROLLER 3 (SC200D111C240US01) (45) SILFAB SIL-400HC+ (400W) (45) ENPHASE IQ8MC-72-M-US
Date Description Comments
06/10/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-RES-0425-01919
Permite Description: 4800W DC, 14400W AC, 5.00 kWh ENERGY STORAGE SYSTEM (1)ENPHASE IQ BATTERY 5P (IQBATTERY-5P-1P-NA) (1)ENPHASE IQ SYSTEM CONTROLLER 3 (SC200D111C240US01) (45) SILFAB SIL-400HC+ (400W) (45) ENPHASE IQ8MC-72-M-US
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
07/16/2025 COT - RSOL - Electrical Underground Solar Project N/A Not Ready

Completed Inspections

Permit Status: Complete
Permit Number: TC-RES-0425-01919
Permit Description: 4800W DC, 14400W AC, 5.00 kWh ENERGY STORAGE SYSTEM (1)ENPHASE IQ BATTERY 5P (IQBATTERY-5P-1P-NA) (1)ENPHASE IQ SYSTEM CONTROLLER 3 (SC200D111C240US01) (45) SILFAB SIL-400HC+ (400W) (45) ENPHASE IQ8MC-72-M-US
Total Completed Inspections - 7
Date Description Inspector Results Comments
07/16/2025 COT - RSBU - Excavation/Rebar/Zoning Passed Approved (2) column piers and grounding coil for solar structure, okay for concrete placement
07/16/2025 COT - RSOL - Grounding/Bonding Solar Project Passed Approved (2) column piers and grounding coil for solar structure, okay for concrete placement
07/30/2025 BULD - Electrical Clearance Passed Passed 7/30/25 CLEARANCE DGC/BAT
07/30/2025 COT - RSOL - Electrical Underground Solar Project Passed Passed 7/30/25 CLEARANCE DGC/BAT
07/30/2025 COT - RSOL - Electrical Final Solar Project Passed Passed 7/30/25 CLEARANCE DGC/BAT
07/30/2025 RSBU - Building Final Passed Passed 7/30/25 CLEARANCE DGC/BAT
07/30/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Passed 7/30/25 CLEARANCE DGC/BAT

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-PERMIT PLANS-BROWN,STEVEN_04082025-REV-D_V2.PDF DOCUMENTS VIEW