Permit: TC-RES-0425-01919
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
1706 E COPPER ST
Address NEW:
1706 E COPPER ST
Apply Date:
04/13/2025
Applicant:
Hailey McGaw
Description:
4800W DC, 14400W AC, 5.00 kWh ENERGY STORAGE SYSTEM (1)ENPHASE IQ BATTERY 5P (IQBATTERY-5P-1P-NA) (1)ENPHASE IQ SYSTEM CONTROLLER 3 (SC200D111C240US01) (45) SILFAB SIL-400HC+ (400W) (45) ENPHASE IQ8MC-72-M-US
Permit Reviews
Permit Number - TC-RES-0425-01919
Permit Status: Complete
Permit Description: 4800W DC, 14400W AC, 5.00 kWh ENERGY
STORAGE SYSTEM
(1)ENPHASE IQ BATTERY 5P
(IQBATTERY-5P-1P-NA)
(1)ENPHASE IQ SYSTEM CONTROLLER 3
(SC200D111C240US01)
(45) SILFAB SIL-400HC+ (400W)
(45) ENPHASE IQ8MC-72-M-US
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/27/2025 | RESIDENTIAL SOLAR v.2 | 06/10/2025 | APPROVED |
| 04/14/2025 | RESIDENTIAL SOLAR v.1 | 05/19/2025 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TC-RES-0425-01919
Permit Status: Complete
Permit Description: 4800W DC, 14400W AC, 5.00 kWh ENERGY
STORAGE SYSTEM
(1)ENPHASE IQ BATTERY 5P
(IQBATTERY-5P-1P-NA)
(1)ENPHASE IQ SYSTEM CONTROLLER 3
(SC200D111C240US01)
(45) SILFAB SIL-400HC+ (400W)
(45) ENPHASE IQ8MC-72-M-US
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 05/07/2025 | SPECIAL INSPECTION FOR PILING, DRILLED PIERS AND CAISSONS IS REQUIRED. |
Conditions
Permit Number - TC-RES-0425-01919
Permit Status: Complete
Permit Description: 4800W DC, 14400W AC, 5.00 kWh ENERGY
STORAGE SYSTEM
(1)ENPHASE IQ BATTERY 5P
(IQBATTERY-5P-1P-NA)
(1)ENPHASE IQ SYSTEM CONTROLLER 3
(SC200D111C240US01)
(45) SILFAB SIL-400HC+ (400W)
(45) ENPHASE IQ8MC-72-M-US
| Date | Description | Comments |
|---|---|---|
| 06/10/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-RES-0425-01919
Permite Description: 4800W DC, 14400W AC, 5.00 kWh ENERGY
STORAGE SYSTEM
(1)ENPHASE IQ BATTERY 5P
(IQBATTERY-5P-1P-NA)
(1)ENPHASE IQ SYSTEM CONTROLLER 3
(SC200D111C240US01)
(45) SILFAB SIL-400HC+ (400W)
(45) ENPHASE IQ8MC-72-M-US
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/16/2025 | COT - RSOL - Electrical Underground Solar Project | N/A | Not Ready |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0425-01919
Permit Description: 4800W DC, 14400W AC, 5.00 kWh ENERGY
STORAGE SYSTEM
(1)ENPHASE IQ BATTERY 5P
(IQBATTERY-5P-1P-NA)
(1)ENPHASE IQ SYSTEM CONTROLLER 3
(SC200D111C240US01)
(45) SILFAB SIL-400HC+ (400W)
(45) ENPHASE IQ8MC-72-M-US
Total Completed Inspections - 7
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/16/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Approved (2) column piers and grounding coil for solar structure, okay for concrete placement | |
| 07/16/2025 | COT - RSOL - Grounding/Bonding Solar Project | Passed | Approved (2) column piers and grounding coil for solar structure, okay for concrete placement | |
| 07/30/2025 | BULD - Electrical Clearance | Passed | Passed 7/30/25 CLEARANCE DGC/BAT | |
| 07/30/2025 | COT - RSOL - Electrical Underground Solar Project | Passed | Passed 7/30/25 CLEARANCE DGC/BAT | |
| 07/30/2025 | COT - RSOL - Electrical Final Solar Project | Passed | Passed 7/30/25 CLEARANCE DGC/BAT | |
| 07/30/2025 | RSBU - Building Final | Passed | Passed 7/30/25 CLEARANCE DGC/BAT | |
| 07/30/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Passed 7/30/25 CLEARANCE DGC/BAT |