Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Residential Building - One or Two Family
Address:
3565 E CODY ST
Address NEW:
3565 E CODY ST
Apply Date:
04/08/2025
Applicant:
Rich Coyle
Description:
Start excavation *Excavate from the gas meter to the back of the house (Approximately 210 ft) *Tench will be 18" to the top of 1" gas line as to code *Tracer wire will be installed for future location. *Gas line will be 1" P.E pipe underground with transition to black iron above ground. * Black iron will be run up to the roof, down the wall to supply the kitchen range. *Dry wall in the kitchen will be removed in order to make access for gas line to be brought in. *Water heater will be supplied in black iron pipe with proper gas shut off. *Gas line will be under pressure for inspector. * Once inspected all fixtures requiring gas will be connected. * To get the stove black iron will run 10 ft vertically up the wall 10 ft horizontal across the roof and 10 ft down the wall on inside of the home. *Pipe will be supported with roof jacks and anchored to exterior wall as well as strapped and supported inside of the home. * To get the water heater approximately 5 ft to black iron will run horizontally with straps and support. *New gas shutoff valve will be installed at every fixture. *Gas line will be under pressure for inspection

Permit Reviews

Permit Number - TC-RES-0425-01839
Permit Status: Issued
Permit Description: Start excavation *Excavate from the gas meter to the back of the house (Approximately 210 ft) *Tench will be 18" to the top of 1" gas line as to code *Tracer wire will be installed for future location. *Gas line will be 1" P.E pipe underground with transition to black iron above ground. * Black iron will be run up to the roof, down the wall to supply the kitchen range. *Dry wall in the kitchen will be removed in order to make access for gas line to be brought in. *Water heater will be supplied in black iron pipe with proper gas shut off. *Gas line will be under pressure for inspector. * Once inspected all fixtures requiring gas will be connected. * To get the stove black iron will run 10 ft vertically up the wall 10 ft horizontal across the roof and 10 ft down the wall on inside of the home. *Pipe will be supported with roof jacks and anchored to exterior wall as well as strapped and supported inside of the home. * To get the water heater approximately 5 ft to black iron will run horizontally with straps and support. *New gas shutoff valve will be installed at every fixture. *Gas line will be under pressure for inspection
Start Date Submittal Complete Date Status  
04/16/2025 RESIDENTIAL NEW DWELLING v.1 04/17/2025 REQUIRES RESUBMIT Review Details
04/18/2025 HAST - RESIDENTIAL NEW DWELLING FAST TRACK v.1 04/18/2025 APPROVED Review Details
04/25/2025 RESIDENTIAL NEW DWELLING REVISION v.1 05/28/2025 APPROVED Review Details

Conditions

Permit Number - TC-RES-0425-01839
Permit Status: Issued
Permit Description: Start excavation *Excavate from the gas meter to the back of the house (Approximately 210 ft) *Tench will be 18" to the top of 1" gas line as to code *Tracer wire will be installed for future location. *Gas line will be 1" P.E pipe underground with transition to black iron above ground. * Black iron will be run up to the roof, down the wall to supply the kitchen range. *Dry wall in the kitchen will be removed in order to make access for gas line to be brought in. *Water heater will be supplied in black iron pipe with proper gas shut off. *Gas line will be under pressure for inspector. * Once inspected all fixtures requiring gas will be connected. * To get the stove black iron will run 10 ft vertically up the wall 10 ft horizontal across the roof and 10 ft down the wall on inside of the home. *Pipe will be supported with roof jacks and anchored to exterior wall as well as strapped and supported inside of the home. * To get the water heater approximately 5 ft to black iron will run horizontally with straps and support. *New gas shutoff valve will be installed at every fixture. *Gas line will be under pressure for inspection
Date Description Comments
04/18/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.

Outstanding Inspections

Permit Status: Issued
Permit Number: TC-RES-0425-01839
Permite Description: Start excavation *Excavate from the gas meter to the back of the house (Approximately 210 ft) *Tench will be 18" to the top of 1" gas line as to code *Tracer wire will be installed for future location. *Gas line will be 1" P.E pipe underground with transition to black iron above ground. * Black iron will be run up to the roof, down the wall to supply the kitchen range. *Dry wall in the kitchen will be removed in order to make access for gas line to be brought in. *Water heater will be supplied in black iron pipe with proper gas shut off. *Gas line will be under pressure for inspector. * Once inspected all fixtures requiring gas will be connected. * To get the stove black iron will run 10 ft vertically up the wall 10 ft horizontal across the roof and 10 ft down the wall on inside of the home. *Pipe will be supported with roof jacks and anchored to exterior wall as well as strapped and supported inside of the home. * To get the water heater approximately 5 ft to black iron will run horizontally with straps and support. *New gas shutoff valve will be installed at every fixture. *Gas line will be under pressure for inspection
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
04/29/2025 RSBU - Building Final N/A Not Applicable

Completed Inspections

Permit Status: Issued
Permit Number: TC-RES-0425-01839
Permit Description: Start excavation *Excavate from the gas meter to the back of the house (Approximately 210 ft) *Tench will be 18" to the top of 1" gas line as to code *Tracer wire will be installed for future location. *Gas line will be 1" P.E pipe underground with transition to black iron above ground. * Black iron will be run up to the roof, down the wall to supply the kitchen range. *Dry wall in the kitchen will be removed in order to make access for gas line to be brought in. *Water heater will be supplied in black iron pipe with proper gas shut off. *Gas line will be under pressure for inspector. * Once inspected all fixtures requiring gas will be connected. * To get the stove black iron will run 10 ft vertically up the wall 10 ft horizontal across the roof and 10 ft down the wall on inside of the home. *Pipe will be supported with roof jacks and anchored to exterior wall as well as strapped and supported inside of the home. * To get the water heater approximately 5 ft to black iron will run horizontally with straps and support. *New gas shutoff valve will be installed at every fixture. *Gas line will be under pressure for inspection
Total Completed Inspections - 3
Date Description Inspector Results Comments
04/29/2025 COT - RSPL - Gas Final Passed
04/29/2025 COT - RSPL - Plumbing Final Passed
04/29/2025 COT - BULD - SWG Clearance Passed SWG

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CODY ST_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-ADOBE SCAN APR 18, 2025_V1.PDF DOCUMENTS VIEW