Permit: TC-RES-0425-01839
Permit Details
Status:
Issued
Type:
Residential Building - One or Two Family
Address:
3565 E CODY ST
Address NEW:
3565 E CODY ST
Apply Date:
04/08/2025
Applicant:
Rich Coyle
Description:
Start excavation *Excavate from the gas meter to the back of the house (Approximately 210 ft) *Tench will be 18" to the top of 1" gas line as to code *Tracer wire will be installed for future location. *Gas line will be 1" P.E pipe underground with transition to black iron above ground. * Black iron will be run up to the roof, down the wall to supply the kitchen range. *Dry wall in the kitchen will be removed in order to make access for gas line to be brought in. *Water heater will be supplied in black iron pipe with proper gas shut off. *Gas line will be under pressure for inspector. * Once inspected all fixtures requiring gas will be connected. * To get the stove black iron will run 10 ft vertically up the wall 10 ft horizontal across the roof and 10 ft down the wall on inside of the home. *Pipe will be supported with roof jacks and anchored to exterior wall as well as strapped and supported inside of the home. * To get the water heater approximately 5 ft to black iron will run horizontally with straps and support. *New gas shutoff valve will be installed at every fixture. *Gas line will be under pressure for inspection
Permit Reviews
Permit Number - TC-RES-0425-01839
Permit Status: Issued
Permit Description: Start excavation
*Excavate from the gas meter to the back of the house (Approximately 210 ft)
*Tench will be 18" to the top of 1" gas line as to code
*Tracer wire will be installed for future location.
*Gas line will be 1" P.E pipe underground with transition to black iron above ground.
* Black iron will be run up to the roof, down the wall to supply the kitchen range.
*Dry wall in the kitchen will be removed in order to make access for gas line to be brought in.
*Water heater will be supplied in black iron pipe with proper gas shut off.
*Gas line will be under pressure for inspector.
* Once inspected all fixtures requiring gas will be connected.
* To get the stove black iron will run 10 ft vertically up the wall 10 ft horizontal across the roof and 10 ft down the wall on inside of the home.
*Pipe will be supported with roof jacks and anchored to exterior wall as well as strapped and supported inside of the home.
* To get the water heater approximately 5 ft to black iron will run horizontally with straps and support.
*New gas shutoff valve will be installed at every fixture.
*Gas line will be under pressure for inspection
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/16/2025 | RESIDENTIAL NEW DWELLING v.1 | 04/17/2025 | REQUIRES RESUBMIT |
| 04/18/2025 | HAST - RESIDENTIAL NEW DWELLING FAST TRACK v.1 | 04/18/2025 | APPROVED |
| 04/25/2025 | RESIDENTIAL NEW DWELLING REVISION v.1 | 05/28/2025 | APPROVED |
Conditions
Permit Number - TC-RES-0425-01839
Permit Status: Issued
Permit Description: Start excavation
*Excavate from the gas meter to the back of the house (Approximately 210 ft)
*Tench will be 18" to the top of 1" gas line as to code
*Tracer wire will be installed for future location.
*Gas line will be 1" P.E pipe underground with transition to black iron above ground.
* Black iron will be run up to the roof, down the wall to supply the kitchen range.
*Dry wall in the kitchen will be removed in order to make access for gas line to be brought in.
*Water heater will be supplied in black iron pipe with proper gas shut off.
*Gas line will be under pressure for inspector.
* Once inspected all fixtures requiring gas will be connected.
* To get the stove black iron will run 10 ft vertically up the wall 10 ft horizontal across the roof and 10 ft down the wall on inside of the home.
*Pipe will be supported with roof jacks and anchored to exterior wall as well as strapped and supported inside of the home.
* To get the water heater approximately 5 ft to black iron will run horizontally with straps and support.
*New gas shutoff valve will be installed at every fixture.
*Gas line will be under pressure for inspection
| Date | Description | Comments |
|---|---|---|
| 04/18/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-RES-0425-01839
Permite Description: Start excavation
*Excavate from the gas meter to the back of the house (Approximately 210 ft)
*Tench will be 18" to the top of 1" gas line as to code
*Tracer wire will be installed for future location.
*Gas line will be 1" P.E pipe underground with transition to black iron above ground.
* Black iron will be run up to the roof, down the wall to supply the kitchen range.
*Dry wall in the kitchen will be removed in order to make access for gas line to be brought in.
*Water heater will be supplied in black iron pipe with proper gas shut off.
*Gas line will be under pressure for inspector.
* Once inspected all fixtures requiring gas will be connected.
* To get the stove black iron will run 10 ft vertically up the wall 10 ft horizontal across the roof and 10 ft down the wall on inside of the home.
*Pipe will be supported with roof jacks and anchored to exterior wall as well as strapped and supported inside of the home.
* To get the water heater approximately 5 ft to black iron will run horizontally with straps and support.
*New gas shutoff valve will be installed at every fixture.
*Gas line will be under pressure for inspection
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/29/2025 | RSBU - Building Final | N/A | Not Applicable |
Completed Inspections
Permit Status: Issued
Permit Number: TC-RES-0425-01839
Permit Description: Start excavation
*Excavate from the gas meter to the back of the house (Approximately 210 ft)
*Tench will be 18" to the top of 1" gas line as to code
*Tracer wire will be installed for future location.
*Gas line will be 1" P.E pipe underground with transition to black iron above ground.
* Black iron will be run up to the roof, down the wall to supply the kitchen range.
*Dry wall in the kitchen will be removed in order to make access for gas line to be brought in.
*Water heater will be supplied in black iron pipe with proper gas shut off.
*Gas line will be under pressure for inspector.
* Once inspected all fixtures requiring gas will be connected.
* To get the stove black iron will run 10 ft vertically up the wall 10 ft horizontal across the roof and 10 ft down the wall on inside of the home.
*Pipe will be supported with roof jacks and anchored to exterior wall as well as strapped and supported inside of the home.
* To get the water heater approximately 5 ft to black iron will run horizontally with straps and support.
*New gas shutoff valve will be installed at every fixture.
*Gas line will be under pressure for inspection
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/29/2025 | COT - RSPL - Gas Final | Passed | ||
| 04/29/2025 | COT - RSPL - Plumbing Final | Passed | ||
| 04/29/2025 | COT - BULD - SWG Clearance | Passed | SWG |