Address Search: 3565 E CODY ST
Search
Parcel Attributes
| Parcel | 122184290 |
|---|---|
| Jurisdiction | Tucson, Pima County |
| City of Tucson Zoning | R-3 |
| Tucson Ward | Ward 6 |
| Tucson Registered Neighborhood | Palo Verde |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Parcel Attributes Issue? | |
Annexations & Original City Zoning (OCZ)
Address: 3565 E CODY ST
Date - 08/19/2026 11:34 p.m.
Total Number Of Annexations & Original City Zoning (1)
Permits
Address: 3565 E CODY ST
Date - 08/19/2026 11:34 p.m.
Total Number Of Permits - (7)
| Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TC-COM-0425-00729 | Withdrawn | 04/14/2025 | N/A | Commercial Building | *Excavate from the gas meter to the back of the house (Approximately 210 ft) *Tench will be 18" to the top of 1" gas line as to code *Tracer wire will be installed for future location. *Gas line will be 1" P.E pipe underground with transition to black iron above ground. * Black iron will be run up to the roof, down the wall to supply the kitchen range. *Dry wall in the kitchen will be removed in order to make access for gas line to be brought in. *Water heater will be supplied in black iron pipe with proper gas shut off. *Gas line will be under pressure for inspector. * Once inspected all fixtures requiring gas will be connected. * To get the stove black iron will run 10 ft vertically up the wall 10 ft horizontal across the roof and 10 ft down the wall on inside of the home. *Pipe will be supported with roof jacks and anchored to exterior wall as well as strapped and supported inside of the home. * To get the water heater approximately 5 ft to black iron will run horizontally with straps and support. *New gas shutoff valve will be installed at every fixture. | |
| TC-RES-0425-01834 | Void | 04/08/2025 | N/A | Residential Building - One or Two Family | VOID: Wrong permit type; scope of work requires Commercial Addition/Alteration permit. xcavate from the gas meter to the back of the house (Approximately 210 ft) *Tench will be 18" to the top of 1" gas line as to code *Tracer wire will be installed for future location. *Gas line will be 1" P.E pipe underground with transition to black iron above ground. * Black iron will be run up to the roof, down the wall to supply the kitchen range. *Dry wall in the kitchen will be removed in order to make access for gas line to be brought in. *Water heater will be supplied in black iron pipe with proper gas shut off. *Gas line will be under pressure for inspector. * Once inspected all fixtures requiring gas will be connected. * To get the stove black iron will run 10 ft vertically up the wall 10 ft horizontal across the roof and 10 ft down the wall on inside of the home. *Pipe will be supported with roof jacks and anchored to exterior wall as well as strapped and supported inside of the home. * To get the water heater approximately 5 ft to black iron will run horizontally with straps and support. *New gas shutoff valve will be installed at every fixture. | |
| TC-RES-0425-01839 | Issued | 04/08/2025 | 12/15/2025 | Residential Building - One or Two Family | Start excavation *Excavate from the gas meter to the back of the house (Approximately 210 ft) *Tench will be 18" to the top of 1" gas line as to code *Tracer wire will be installed for future location. *Gas line will be 1" P.E pipe underground with transition to black iron above ground. * Black iron will be run up to the roof, down the wall to supply the kitchen range. *Dry wall in the kitchen will be removed in order to make access for gas line to be brought in. *Water heater will be supplied in black iron pipe with proper gas shut off. *Gas line will be under pressure for inspector. * Once inspected all fixtures requiring gas will be connected. * To get the stove black iron will run 10 ft vertically up the wall 10 ft horizontal across the roof and 10 ft down the wall on inside of the home. *Pipe will be supported with roof jacks and anchored to exterior wall as well as strapped and supported inside of the home. * To get the water heater approximately 5 ft to black iron will run horizontally with straps and support. *New gas shutoff valve will be installed at every fixture. *Gas line will be under pressure for inspection | |
| T09AN00589 | ISSUED | 11/06/2009 | N/A | ADDRNEW | ||
| T09EL02481 | FINAL | 11/09/2009 | 05/22/2010 | ELECT | UPGRADE SERVICE TO METER PACK | |
| T09ME00791 | FINAL | 12/11/2009 | 06/12/2010 | MECH | REPLACE 20,000 BTU GAS FURNACE | |
| T19RW00477 | FINAL | 01/28/2019 | 03/06/2019 | ROW | TEP will be removing 2 poles (299 & 300) in dirt shoulder NOTE: 1175 N Richey Bl was requested - that is not a valid address |