Permit: TC-RES-0425-01778
Permit Details
Status:
Issued
Type:
Residential Building - One or Two Family
Address:
4025 E POE ST
Address NEW:
4025 E POE ST
Apply Date:
04/04/2025
Applicant:
Edy Yee
Description:
REV1: Enlarge windows; Enlarge exterior door; Provide structural engineering for openings; Add additional recessed light on east side; Add additional recessed light in Great Room GUEST HOUSE - Sleeping Quarters (Confirmed not an ADU)
Permit Reviews
Permit Number - TC-RES-0425-01778
Permit Status: Issued
Permit Description: REV1: Enlarge windows; Enlarge exterior door; Provide structural engineering for openings; Add additional recessed light on east side; Add additional recessed light in Great Room
GUEST HOUSE - Sleeping Quarters (Confirmed not an ADU)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/17/2025 | RESIDENTIAL NEW DWELLING v.1 | 05/19/2025 | REQUIRES RESUBMIT |
| 02/18/2026 | RESIDENTIAL NEW DWELLING REVISION v.1 | 03/05/2026 | REQUIRES RESUBMIT |
| 06/04/2025 | RESIDENTIAL NEW DWELLING v.3 | 07/14/2025 | APPROVED |
| 03/12/2026 | RESIDENTIAL NEW DWELLING REVISION v.2 | 03/23/2026 | APPROVED |
| 05/30/2025 | RESIDENTIAL NEW DWELLING v.2 | 05/30/2025 | REQUIRES RESUBMIT |
| 11/26/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 11/26/2025 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TC-RES-0425-01778
Permit Status: Issued
Permit Description: REV1: Enlarge windows; Enlarge exterior door; Provide structural engineering for openings; Add additional recessed light on east side; Add additional recessed light in Great Room
GUEST HOUSE - Sleeping Quarters (Confirmed not an ADU)
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 07/14/2025 | Submission of the final Elevation Certificate and completion of the Floodplain Use Permit is required PRIOR TO FINALING this permit. |
Conditions
Permit Number - TC-RES-0425-01778
Permit Status: Issued
Permit Description: REV1: Enlarge windows; Enlarge exterior door; Provide structural engineering for openings; Add additional recessed light on east side; Add additional recessed light in Great Room
GUEST HOUSE - Sleeping Quarters (Confirmed not an ADU)
| Date | Description | Comments |
|---|---|---|
| 04/17/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 07/14/2025 | An intermediate Elevation Certificate is required PRIOR TO GRADING and/or PRE-SLAB INSPECTION. |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-RES-0425-01778
Permite Description: REV1: Enlarge windows; Enlarge exterior door; Provide structural engineering for openings; Add additional recessed light on east side; Add additional recessed light in Great Room
GUEST HOUSE - Sleeping Quarters (Confirmed not an ADU)
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/12/2025 | COT - RSPL - Sewer | N/A | Not Ready | |
| 01/13/2026 | COT - RSEL - Electrical Underground | N/A | Partial Pass | 1.13.26 Partial pass, ok to cover progress areas and continue work |
Completed Inspections
Permit Status: Issued
Permit Number: TC-RES-0425-01778
Permit Description: REV1: Enlarge windows; Enlarge exterior door; Provide structural engineering for openings; Add additional recessed light on east side; Add additional recessed light in Great Room
GUEST HOUSE - Sleeping Quarters (Confirmed not an ADU)
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/12/2025 | COT - RSPL - Rough Soil | Passed | ||
| 12/02/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 12.2.25 | |
| 01/13/2026 | COT - RSPL - Gas Pressure Test | Passed | 1.13.26 gas pressure verified |
|
| 05/12/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Passed 5/12/26 |